==Summary==
==Summary==
A Biomass Waste EFW facility located in Tansterne near Hullwhich is based on c.150,000 tonnes per annum of waste wood generating 22MW of electricity to the grid<ref name="Tan">[https://solar21.ie/projects/biomass-21/ Solar 21 Biomass]</ref>.
A Biomass Waste EFW facility located in Tansterne near Hull which is based on c.150,000 tonnes per annum of waste wood generating 22MW of electricity to the grid<ref name="Tan">[https://solar21.ie/projects/biomass-21/ Solar 21 Biomass]</ref>.


It was funded and developed by Irish renerwable energy company [[Solar 21]] in partnership with Heat Recovery Solutions (HRS) Ltd<ref>[https://www.letsrecycle.com/news/latest-news/probio-energy-wins-170000tpa-biomass-contract/ Lets Recycle]</ref>. The plant became fully operational in Februaury 2018.
It was funded and developed by Irish renerwable energy company [[Solar 21]] in partnership with Heat Recovery Solutions (HRS) Ltd<ref>[https://www.letsrecycle.com/news/latest-news/probio-energy-wins-170000tpa-biomass-contract/ Lets Recycle]</ref>. The plant became fully operational in Februaury 2018.

Revision as of 13:26, 8 April 2020

Template:Biomass Plant

Summary

A Biomass Waste EFW facility located in Tansterne near Hull which is based on c.150,000 tonnes per annum of waste wood generating 22MW of electricity to the grid[1].

It was funded and developed by Irish renerwable energy company Solar 21 in partnership with Heat Recovery Solutions (HRS) Ltd[2]. The plant became fully operational in Februaury 2018.

Plant

The biomass power plant utilises a fluidised bed combustion, heat recovery and power module technology developed by HRS a subsidiary HRS Energy Ltd which was manufactured in Hull by project partner CF Struthers, the sister company to HRS Energy[3].

In September 2019 the O&M contractor HRS Energy Tansterne Ltd (HRSET) went into administration. HRSET had originally held the O&M contract until it expired on 01/09/73. The plant is now owner-operated by GIB-Bio Ltd which is a subsidiary of Solar 21, the owners of the facility[1].