A [[Biomass EfW]] facility based on 67,000 tonnes per annum of waste wood producing 10.3 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met. The facility is located in Tyseley in Birmingham, adjacent to [[Tyseley ERF]]. The waste wood feedstock is sourced locally through a feedstock contract with Jack Moody Envirofuels Limited<ref name="ref1" >Power Technology, 2016. [https://www.power-technology.com/projects/birmingham-bio-power-plant-tyseley/ Birmingham Bio Power Plant, Tyseley - Power Technology | Energy News and Market Analysis. Online. [Accessed 3 April 2020].]</ref>.
A [[Biomass EfW]] facility based on processing up to 67,000 tonnes per annum of waste wood producing 10.3 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met. The facility is located in Tyseley in Birmingham, adjacent to [[Tyseley ERF]]. The waste wood feedstock is sourced locally through a feedstock contract with Jack Moody Envirofuels Limited<ref name="ref1" >Power Technology, 2016. [https://www.power-technology.com/projects/birmingham-bio-power-plant-tyseley/ Birmingham Bio Power Plant, Tyseley - Power Technology | Energy News and Market Analysis. Online. [Accessed 3 April 2020].]</ref>.


The facility was developed by CoGen, who continue to provide management services, and is operated by Engie. Birmingham Bio Power became operational at the start of 2016<ref>CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020].</ref>.
The facility was developed by CoGen, who continue to provide management services, and is operated by Engie. Birmingham Bio Power became operational at the start of 2016<ref>CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020].</ref>.
Line 26: Line 26:
This facility has been replicated by its sister project [[Welland | Welland Bio Power]].  
This facility has been replicated by its sister project [[Welland | Welland Bio Power]].  


==Local Authority Users==
==Tonnage Input/Fuel==
The tonnage received by the plant is reported as [[Wood Waste]] in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref>. Because the plant is an [[Advanced Conversion Technology]] and produces a [[Syngas]] the sustainability report talks in terms of the gas input to the energy recovery system, rather than the unprocessed [[Wood Waste]] into the plant, which was 287,870,574 cubic meters.
The [[Wood Waste]] is exclusively supplied by [[Jack Moody Envirofuels Limited]] which sources much of the [[Wood Waste]] from [[Waste Disposal Authorities]]. The [[Wood Waste]] tonnage received and recorded in the [[EA]] statistics for the calendar year (i.e. January 2018 to December 2018) was '''24,494''' tonnes.
 


==References==