Lancing Biomass Plant: Difference between revisions

From Wikiwaste
MCWaste (talk | contribs)
No edit summary
Bin52 (talk | contribs)
Update links
Tag: New redirect
 
Line 1: Line 1:
#redirect [[Lancing EfW]]
[[Category:Biomass EfW Plants]]
[[Category:Biomass EfW Plants]]
{{BiomassPlant|NAME=Lancing Biomass Plant|id=48}}
==Summary==
A [[Biomass EfW]] facility based on consuming 40,000 tonnes per annum of mainly waste wood feedstock to produce 5 MW of electricity to be exported to the national grid. The facility is located in Lancing in West Sussex. The feedstock that is accepted at the facility includes wood, paper and organic-based construction and demolition waste<ref name="ref1">Lets Recycle, 2007. [https://www.letsrecycle.com/news/latest-news/plans-unveiled-for-10m-biomass-plant-in-sussex/ Plans Unveiled For 10M Biomass Plant In Sussex - Letsrecycle.Com. Online. letsrecycle.com. [Accessed 16 April 2020].]</ref>.
The Lancing biomass plant began construction in 2007 and became operational in 2008. The facility is operated and was developed by Rabbit Waste Management Ltd<ref name="ref2">Rabbit Group, 2020. [https://www.rabbitgroup.co.uk/energy-from-waste.htm Energy From Waste Facility For Green Waste Disposal & Recycling UK. Online. Rabbitgroup.co.uk. [Accessed 16 April 2020].]</ref>.
==Plant==
The facility cost £10m to develop<ref name="ref1"/> and is collocated with recycling operations<ref name="ref2"/>.
==Local Authority Users==
==References==
<references/>

Latest revision as of 08:54, 21 April 2020

Redirect to: