Also known as Enviropower, this is an [[EfW]] facility based upon conventional combustion technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Lancing has permitted operational capacity of up to 75,000 tonnes per annum, and is owned and operated by [[Enviropower Ltd]], a subsidiary of [[Rabbit Group]]. Delivery of waste is from the adjacent [[Rabbit]] transfer station which prepares the [[Waste Derived Fuel]] for the plant comprising a [[Wood Waste]] /[[Biomass]] rich [[RDF]] and as a result is listed both within the [[Residual Waste EFW]] and [[Biomass Waste EFW]] listings. | |||
==History== | ==History== | ||
Line 10: | Line 10: | ||
==Plant== | ==Plant== | ||
The plant comprises standard combustion, on 2 lines of Talbot Grates, generating super-heated steam, generating up to 5MWe for export to | The plant comprises standard combustion, on 2 lines of Talbot Grates, generating super-heated steam, generating up to 5MWe for export to the national grid. | ||
== | ==Tonnage Input/Fuel== | ||
The | The tonnage received by the plant in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> was reported by [[Ofgem]] as follows: | ||
{| class="wikitable" | |||
|- | |||
! Biomass !! Tonnage (2018-19) | |||
{|class="wikitable | |- | ||
! | | [[Wood Waste]] || '''63,754''' | ||
! Tonnage | |- | ||
| Other || 0 | |||
|- | |||
| Total||63,754 | |||
|} | |} | ||
The [[Wood Waste]] is received from a variety of sources, including [[Waste Disposal Authority]]s, al lof which is processed in the adjacent transfer station prior to use in the Enviropower site. The [[Wood Waste]] tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and are reported as '''60,356''' in the pull-out table to the right. | |||
==References== | ==References== | ||
<references /> | <references /> |
Revision as of 07:24, 27 April 2020
Lancing EfW Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | XP3030XX |
Operator | Enviropower Ltd |
Region | South East |
Operational Capacity | 75ktpa |
Is site R1? | fal |
When was R1 Granted? | |
What was the R1 value | 0.00 |
Electrical Capacity | 5.00MWe |
Number of Lines | 2 |
Number of Turbines | 2 |
CHP | |
Technology Approach | EfW |
Funding Type | Merchant |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 0.00 | 0.00 | 0.00 | 59005.00 | 59005.00 |
2017 | 0.00 | 0.00 | 0.00 | 33280.00 | 33280.00 |
2018 | 0.00 | 0.00 | 0.00 | 57012.00 | 59629.00 |
2019 | 0.00 | 0.00 | 0.00 | 51537.00 | 55021.00 |
2020 | 0.00 | 0.00 | 0.00 | 60315.00 | 64056.00 |
2021 | 0.00 | 0.00 | 0.00 | 64666.00 | 66880.00 |
2022 | 0.00 | 0.00 | 0.00 | 52905.00 | 52905.00 |
2023 | 0.00 | 0.00 | 0.00 | 0.00 | 64158.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 6370.00 | 10.80% | 3580.00 | 6.07% |
2017 | 4601.00 | 13.83% | 1965.00 | 5.90% |
2018 | 12365.00 | 20.74% | 3442.00 | 5.77% |
2019 | 12941.00 | 23.52% | 4300.00 | 7.82% |
2020 | 11713.00 | 18.29% | 4551.00 | 7.10% |
2021 | 12262.00 | 18.33% | 3952.00 | 5.91% |
2022 | 4531.00 | 8.56% | 1823.00 | 3.45% |
2023 | 6248.00 | 9.74% | 2607.00 | 4.06% |
Summary
Also known as Enviropower, this is an EfW facility based upon conventional combustion technology which is not considered an ERF as a result of not having R1 status. Lancing has permitted operational capacity of up to 75,000 tonnes per annum, and is owned and operated by Enviropower Ltd, a subsidiary of Rabbit Group. Delivery of waste is from the adjacent Rabbit transfer station which prepares the Waste Derived Fuel for the plant comprising a Wood Waste /Biomass rich RDF and as a result is listed both within the Residual Waste EFW and Biomass Waste EFW listings.
History
The Rabbit facility was opened in 2008 to primarily service residual Wood Waste from skips and construction sources, with later expansion into a wider specification RDF produced in the adjacent transfer station and is reported as costing £15m[1].
Plant
The plant comprises standard combustion, on 2 lines of Talbot Grates, generating super-heated steam, generating up to 5MWe for export to the national grid.
Tonnage Input/Fuel
The tonnage received by the plant in the most recent Annual Sustainability Report for 2018-19[2] was reported by Ofgem as follows:
Biomass | Tonnage (2018-19) |
---|---|
Wood Waste | 63,754 |
Other | 0 |
Total | 63,754 |
The Wood Waste is received from a variety of sources, including Waste Disposal Authoritys, al lof which is processed in the adjacent transfer station prior to use in the Enviropower site. The Wood Waste tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and are reported as 60,356 in the pull-out table to the right.