Lancing EfW: Difference between revisions

Bin52 (talk | contribs)
m Update links
Bin52 (talk | contribs)
m tonnage data added
Line 4: Line 4:


==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Lancing has permitted operational capacity of 75,000 tonnes per annum, and is owned and operated by [[Enviropower Ltd]], a subsidiary of [[Rabbit Group]]. Delivery of waste is from the adjacent [[Rabbit]] transfer station which prepares the [[Waste Derived Fuel]] for the plant comprising a [[Wood Waste]] /[[Biomass]] rich [[RDF]] and as a result is listed both within the [[Residual Waste EFW]] and [[Biomass Waste EFW]] listings.
Also known as Enviropower, this is an [[EfW]] facility based upon conventional combustion technology which is not considered an [[ERF]] as a result of not having [[R1]] status. Lancing has permitted operational capacity of up to 75,000 tonnes per annum, and is owned and operated by [[Enviropower Ltd]], a subsidiary of [[Rabbit Group]]. Delivery of waste is from the adjacent [[Rabbit]] transfer station which prepares the [[Waste Derived Fuel]] for the plant comprising a [[Wood Waste]] /[[Biomass]] rich [[RDF]] and as a result is listed both within the [[Residual Waste EFW]] and [[Biomass Waste EFW]] listings.


==History==
==History==
Line 10: Line 10:


==Plant==
==Plant==
The plant comprises standard combustion, on 2 lines of Talbot Grates, generating super-heated steam, generating up to 5MWe for export to he national grid.
The plant comprises standard combustion, on 2 lines of Talbot Grates, generating super-heated steam, generating up to 5MWe for export to the national grid.


==Local Authority Users==
==Tonnage Input/Fuel==
The following data comes from [[WasteDataFlow]] for the financial year 2018/19 and represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
The tonnage received by the plant in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> was reported by [[Ofgem]] as follows:
{{#clear_external_data:}}
{| class="wikitable"
{{#get_db_data: db=engy
|-
|from=wdfincin|where=epr='XP3030XX'|data=authority=authority,epr=epr,ton=ton}}
! Biomass !! Tonnage (2018-19)
{|class="wikitable sortable"
|-
! Authority
| [[Wood Waste]] || '''63,754'''
! Tonnage {{#for_external_table:<nowiki/>
|-
{{!}}-
| Other || 0
{{!}} [[{{{authority}}}]]
|-
{{!}} {{{ton}}}
| Total||63,754
}}
|}
|}
The [[Wood Waste]] is received from a variety of sources, including [[Waste Disposal Authority]]s, al lof which is processed in the adjacent transfer station prior to use in the Enviropower site. The [[Wood Waste]] tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and are reported as '''60,356''' in the pull-out table to the right.
==References==
==References==
<references />
<references />