Drakelow Renewable Energy Centre: Difference between revisions
add page specific text |
m add page specific text |
||
Line 5: | Line 5: | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon [[Gasification]] technology. The Drakelow site is near Burton Upon Trent on an old demolished coal-fired power station site owned by [[EON]], was originally developed by [[Future Earth Energy]], but reached financial close with Vital Energi in February 2020. Vital Energi will also take the project forwards and act as the operator when built<ref>[https://www.vitalenergi.co.uk/blog/vital-energi-invests-in-energy-from-waste-facility-set-to-add-18mwe-of-green-energy-to-the-grid/ Vital Energi Website]</ref>. | An [[EfW]] facility based upon [[Gasification]] technology. The Drakelow site is near Burton Upon Trent on an old demolished coal-fired power station site owned by [[EON]], was originally developed by [[Future Earth Energy]], but reached financial close with [[Vital Energi]] in February 2020. [[Vital Energi]] will also take the project forwards and act as the operator when built<ref>[https://www.vitalenergi.co.uk/blog/vital-energi-invests-in-energy-from-waste-facility-set-to-add-18mwe-of-green-energy-to-the-grid/ Vital Energi Website]</ref>. | ||
==Technology== | ==Technology== | ||
The plant is understood to be a 3 line, grate based technology by [[Biomass Power Limited]], generating steam to turbines delivering 18MWe gross (15MWe net) and will be CHP enabled. | The plant is understood to be a 3 line, grate based technology by [[Biomass Power Limited]] which is now part of [[Vital Energi]], generating steam to turbines delivering 18MWe gross (15MWe net) and will be CHP enabled. | ||
==Construction== | ==Construction== | ||
The plant is | The plant is to be delivered by [[Vital Energi]] and is due to be operational in 2023 <ref>[https://www.letsrecycle.com/news/latest-news/vital-energi-efw/ Letsrecycle Article]</ref>. | ||
==Waste Input== | ==Waste Input== |
Revision as of 11:27, 24 April 2020
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "operator" has been set.]] |
Region | [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]] |
Operational Capacity | Error: no local variable "cap" has been set.ktpa |
Is site R1? | Error: no local variable "r1" has been set. |
When was R1 Granted? | Error: no local variable "r1date" has been set. |
What was the R1 value | Error: no local variable "r1value" has been set. |
Electrical Capacity | Error: no local variable "mwe" has been set.MWe |
Number of Lines | Error: no local variable "line" has been set. |
Number of Turbines | Error: no local variable "turbine" has been set. |
CHP | Error: no local variable "chp" has been set. |
Technology Approach | Error: no local variable "techtype" has been set. |
Funding Type | [[Error: no local variable "funding" has been set.]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
An EfW facility based upon Gasification technology. The Drakelow site is near Burton Upon Trent on an old demolished coal-fired power station site owned by EON, was originally developed by Future Earth Energy, but reached financial close with Vital Energi in February 2020. Vital Energi will also take the project forwards and act as the operator when built[1].
Technology
The plant is understood to be a 3 line, grate based technology by Biomass Power Limited which is now part of Vital Energi, generating steam to turbines delivering 18MWe gross (15MWe net) and will be CHP enabled.
Construction
The plant is to be delivered by Vital Energi and is due to be operational in 2023 [2].
Waste Input
The plant is listed to run on 169,000 tonnes per year of prepared RDF from offsite company Beauparc under an exclusive Fuel Supply Agreement.