Newport Alexandra Docks: Difference between revisions

From Wikiwaste
MCWaste (talk | contribs)
No edit summary
MCWaste (talk | contribs)
No edit summary
Line 8: Line 8:


==Summary==
==Summary==
An [[EfW]] facility that reached financial close in early 2020, the facility will accept up to 220,000 tonnes per annum of [[Refuse Derived Fuel]] as feedstock and generate electricity to be exported to the national grid. This facility will be located in Newport, South Wales.<ref name="ref1" >Andusia, 2020. [https://www.andusia.co.uk/wte-plants/newport-efw-plant/ New EfW Plant In Newport. Online. Andusia. [Accessed 27 April 2020].]</ref>.
An [[EfW]] facility that reached financial close in early 2020, the facility will accept up to 220,000 tonnes per annum of [[Refuse Derived Fuel]] as feedstock and generate electricity to be exported to the national grid. This facility will be located in Newport, South Wales<ref name="ref1" >Andusia, 2020. [https://www.andusia.co.uk/wte-plants/newport-efw-plant/ New EfW Plant In Newport. Online. Andusia. [Accessed 27 April 2020].]</ref>.


This facility will become an essential part of Newport’s waste management plan going into the future<ref name="ref1"/>.
This facility will become an essential part of Newport’s waste management plan going into the future<ref name="ref1"/>.


==Technology==
==Technology==
The conventional EfW plant will be implementing proven technology for the incineration process<ref name="ref1"/>
The conventional EfW plant will be implementing proven technology for the incineration process<ref name="ref1"/>.


==Construction==
==Construction==

Revision as of 16:07, 27 April 2020


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Newport Alexandra Docks EfW. Andusia, 2020.
Newport Alexandra Docks EfW. Andusia, 2020.



Summary

An EfW facility that reached financial close in early 2020, the facility will accept up to 220,000 tonnes per annum of Refuse Derived Fuel as feedstock and generate electricity to be exported to the national grid. This facility will be located in Newport, South Wales[1].

This facility will become an essential part of Newport’s waste management plan going into the future[1].

Technology

The conventional EfW plant will be implementing proven technology for the incineration process[1].

Construction

Construction of this facility started early in 2020 and is scheduled to become operational in 2021[1].

Waste Input

The Refuse Derived Fuel waste feedstock will be supplied by Andusia, as the sole waste supplier of this facility. The 220,000 tpa of RDF will be delivered under a 25-year feedstock supply contract, and will be locally sourced from industrial, commercial and municipal waste arising in South Wales[1].


References