Newport Alexandra Docks: Difference between revisions

MCWaste (talk | contribs)
No edit summary
MCWaste (talk | contribs)
No edit summary
Line 8: Line 8:


==Summary==
==Summary==
An [[EfW]] facility that reached financial close in early 2020, the facility will accept up to 220,000 tonnes per annum of [[Refuse Derived Fuel]] as feedstock and generate electricity to be exported to the national grid. This facility will be located in Newport, South Wales.<ref name="ref1" >Andusia, 2020. [https://www.andusia.co.uk/wte-plants/newport-efw-plant/ New EfW Plant In Newport. Online. Andusia. [Accessed 27 April 2020].]</ref>.
An [[EfW]] facility that reached financial close in early 2020, the facility will accept up to 220,000 tonnes per annum of [[Refuse Derived Fuel]] as feedstock and generate electricity to be exported to the national grid. This facility will be located in Newport, South Wales<ref name="ref1" >Andusia, 2020. [https://www.andusia.co.uk/wte-plants/newport-efw-plant/ New EfW Plant In Newport. Online. Andusia. [Accessed 27 April 2020].]</ref>.


This facility will become an essential part of Newport’s waste management plan going into the future<ref name="ref1"/>.
This facility will become an essential part of Newport’s waste management plan going into the future<ref name="ref1"/>.


==Technology==
==Technology==
The conventional EfW plant will be implementing proven technology for the incineration process<ref name="ref1"/>
The conventional EfW plant will be implementing proven technology for the incineration process<ref name="ref1"/>.


==Construction==
==Construction==