Anaerobic Digestion: Difference between revisions

Bin52 (talk | contribs)
m add page specific text
Bin52 (talk | contribs)
m add page specific text
Line 94: Line 94:




The table below is reproduced from table 4.3 in the Renewable Obligation Annual Report 2017-18 by [[Ofgem]] and shows the consignments reported by AD against the sustainability criteria required by the [[Biomass Sustainability]] reporting<ref>[https://www.ofgem.gov.uk/system/files/docs/2019/03/ro_annual_report_2017-18_final.pdf Renewable Obligation Annual Report 2017-18]</ref> :
The table below is reproduced from table 4.3 in the Renewable Obligation Annual Report 2017-18 by [[Ofgem]] and shows the consignments reported by AD against the sustainability criteria required by the [[Biomass Sustainability]] reporting, although those with <1MW are not formally linked to a [[ROC]] issue<ref>[https://www.ofgem.gov.uk/system/files/docs/2019/03/ro_annual_report_2017-18_final.pdf Renewable Obligation Annual Report 2017-18]</ref> :
{| class="wikitable"
{| class="wikitable"
|-
|-
Line 119: Line 119:
|Total ||1133 ||332||789||12
|Total ||1133 ||332||789||12
|}
|}
 
There are currently 100 AD stations with a Greenhouse Gas Emission  installed caapcity less than 1MW
The difference betwen the National Statistics data and the Ofgem data above, i.e. 221 sites, can be inferred to be those AD plants that are producing biomethane rather than electricity (assuming their datasets align).  
The difference betwen the National Statistics data and the Ofgem data above, i.e. 221 sites, can be inferred to be those AD plants that are producing biomethane rather than electricity (assuming their datasets align).