Riverside Resource Recovery Facility (RRRF): Difference between revisions
No edit summary |
No edit summary |
||
| Line 17: | Line 17: | ||
The Local Authority tonnage below is higher than the tonnage reported in the summary box on this page. This is a result of the Local Authority listing their tonnage under two separate permit numbers for the same site, whereas the summary box is for the tonnage specifically listed under the actual site permit. | The Local Authority tonnage below is higher than the tonnage reported in the summary box on this page. This is a result of the Local Authority listing their tonnage under two separate permit numbers for the same site, whereas the summary box is for the tonnage specifically listed under the actual site permit. | ||
The following | The following represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year. | ||
{{#clear_external_data:}} | {{#clear_external_data:}} | ||
{{#get_db_data: db=engy | {{#get_db_data: db=engy | ||