Blackburn Meadows Renewable Energy Plant: Difference between revisions

Wikiwaster123 (talk | contribs)
mNo edit summary
Bin52 (talk | contribs)
m minor text change
Line 15: Line 15:
The unique architectural work was undertaken by BDP, which includes an orange translucent clad boiler house that is internally illuminated<ref name="ref2"/>.
The unique architectural work was undertaken by BDP, which includes an orange translucent clad boiler house that is internally illuminated<ref name="ref2"/>.


The facility cost £120 million to develop<ref>Bioenergy Insight, 2014. [https://www.bioenergy-news.com/news/e-ons-blackburn-meadows-biomass-plant-generates-electricity/ E.ON's Blackburn Meadows Biomass Plant Generates Electricity. Online. Bioenergy Insight. [Accessed 6 April 2020]].</ref>.
The facility cost £120 million to develop<ref>Bioenergy Insight, 2014. [https://www.bioenergy-news.com/news/e-ons-blackburn-meadows-biomass-plant-generates-electricity/ E.ON's Blackburn Meadows Biomass Plant Generates Electricity. Online. Bioenergy Insight. [Accessed 6 April 2020]].</ref>. It has an [[Andritz]] boiler.


==Tonnage Input/Fuel==
==Tonnage Input/Fuel==