Beddington Farmlands Landfill Site: Difference between revisions

Howard (talk | contribs)
Howard (talk | contribs)
Line 2: Line 2:
[[Category:Non-Haz Landfill]]
[[Category:Non-Haz Landfill]]
==Summary==
==Summary==
The site was developed by Thames Waste Management from the early 1990s onwards. Thames Waste Management were acquired by Viridor in 2004 and were renamed Viridor Waste (Thames) Limited thereafter.
The site comprises a modern landfill engineered to Landfill DIrective standards.


==History==
==History==