Beddington Farmlands Landfill Site: Difference between revisions
| Line 30: | Line 30: | ||
Viridor discharge leachate to the local sewerage system which discharges to the adjoining sewage treatment works. In 2019, it was proposed to install a methane stripping plant to pre-treat the leachate prior to discharge. | Viridor discharge leachate to the local sewerage system which discharges to the adjoining sewage treatment works. In 2019, it was proposed to install a methane stripping plant to pre-treat the leachate prior to discharge. | ||
Other Infrastructure | ==Other Infrastructure== | ||
Elsewhere within the site complex, Viridor have also developed several other waste processing facilities, including a waste transfer station, a skip waste MRF, an In-vessel Composting (IVC) facility and an Energy-from-Waste facility. Several of these facilities are associated with contracts with the South London Waste Partnership. | Elsewhere within the site complex, Viridor have also developed several other waste processing facilities, including a waste transfer station, a skip waste MRF, an In-vessel Composting (IVC) facility and an Energy-from-Waste facility. Several of these facilities are associated with contracts with the South London Waste Partnership. | ||