Dimmer Landfill Site: Difference between revisions
m minor text change |
m change template |
||
| Line 33: | Line 33: | ||
Elsewhere within the site complex, Viridor also developed a [[Composting]] facility and an [In-vessel Composting]] ([[IVC]]) facility to deal with some of [[Somerset County Council]]'s separately collected [[Green Waste]] and some [[Food Waste]]. This facility is no longer in operation and has been converted to be used as a Waste Transfer Station. Whilst a planning consent was granted for an [[Anaerobic Digestion]] facility this was not built, with this infrastructure being built at [[Walpole Recovery Facility and Landfill Site]] instead. | Elsewhere within the site complex, Viridor also developed a [[Composting]] facility and an [In-vessel Composting]] ([[IVC]]) facility to deal with some of [[Somerset County Council]]'s separately collected [[Green Waste]] and some [[Food Waste]]. This facility is no longer in operation and has been converted to be used as a Waste Transfer Station. Whilst a planning consent was granted for an [[Anaerobic Digestion]] facility this was not built, with this infrastructure being built at [[Walpole Recovery Facility and Landfill Site]] instead. | ||
{{NHLFTable|Permit=UP3139BB}} | {{NHLFTable|Permit=UP3139BB}} | ||
==References== | ==References== | ||
<references /> | <references /> | ||