Edmonton EcoPark EfW: Difference between revisions
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
{{#vardefine:epr|YP3033BE}} | |||
[Category:EfW Plants]] | |||
An [[EfW]] facility based upon conventional combustion technology which is considered an [[ERF]] as a result of having [[R1]] status. Edmonton has permitted operational capacity of 675,000 tonnes per annum (although reported also at 500,000 tonnes per annum), operated by [[LondonEnergy]], a local authority owned company formally known as [[LondonWaste]]. Delivery of waste is by road, with easy connection from the North Circular road in Enfield, and the facility processes primarily residual [[Household Waste]] similar residual [[Commercial Waste]] as well as other waste infrastructure on the site. | |||
{{EfWTemplate|EPR={{#var:epr}}|id=5}} | |||
[[File:Edmonton.png|240px|left|Edmonton EcoPark EFW]] | [[File:Edmonton.png|240px|left|Edmonton EcoPark EFW]] | ||
==Summary== | ==Summary== | ||
| Line 16: | Line 18: | ||
{{#clear_external_data:}} | {{#clear_external_data:}} | ||
{{#get_db_data: db=engy | {{#get_db_data: db=engy | ||
|from=wdfincin|where=epr=' | |from=wdfincin|where=epr='{{#var:epr}}'|data=authority=authority,epr=epr,ton=ton}} | ||
{|class="wikitable sortable" | {|class="wikitable sortable" | ||
! Authority | ! Authority | ||