==History==
==History==
The Glasgow facility was built as an integrated solution primarily to service a 25 year [[PPP]] (Design Build Finance Operate ("DBFO" model) <ref>https://www.glasgow.gov.uk/CHttpHandler.ashx?id=31413&p=0</ref> contract with [[Glasgow City Council]] signed in July 2012 to process around 350,000 tonnes per annum. The facility diverts around 200,000 tonnes per annum from [[Landfill]] via a combination of [[Mechanical Biological Treatment]] including [[Anaerobic Digestion]], with the [[RDF]] output sent to the [[ATT]]/[[Gasification]] facility with a capacity listed of 150,000 tonnes per annum and power output of 15MWe.
The Glasgow facility was built as an integrated solution primarily to service a 25 year [[PPP]] ([[Design Build Finance Operate]] ("[[DBFO]]" model) <ref>https://www.glasgow.gov.uk/CHttpHandler.ashx?id=31413&p=0</ref> contract with [[Glasgow City Council]] signed in July 2012 to process around 350,000 tonnes per annum. The facility diverts around 200,000 tonnes per annum from [[Landfill]] via a combination of [[Mechanical Biological Treatment]] including [[Anaerobic Digestion]], with the [[RDF]] output sent to the [[ATT]]/[[Gasification]] facility with a capacity listed of 150,000 tonnes per annum and power output of 15MWe.


==Plant==
==Plant==