==Summary==
==Summary==
An [[EfW]] facility based upon conventional combustion technology and presently in late stage construction. Kemsley (K3) has a current forecast operational capacity of 550,000 tonnes per annum with plans to extend (see Technology section below). The project has been developed and will be operated by [[Wheelabrator]] and was funded by the [[Green Investment Bank]], [[BTMU]], [[Natixis]] and [[Investec]]. The project reached financial close in September 2016 for GBP £340m<ref>[https://www.wtikemsley.co.uk/site/assets/files/1315/wheelabrator_news_release_-_kemsley_financial_close_-_28_july_2016_-_uk_final.pdf Wheelabrator Press Release]</ref>..
An [[EfW]] facility based upon conventional combustion technology and presently in late stage construction. Kemsley (K3) has a current forecast operational capacity of 550,000 tonnes per annum with plans to extend (see Technology section below). The project has been developed and will be operated by [[Wheelabrator]] and was funded by the [[Green Investment Bank]], [[BTMU]], [[Natixis]] and [[Investec]]. The project reached financial close in September 2016 for GBP £340m<ref>[https://www.wtikemsley.co.uk/site/assets/files/1315/wheelabrator_news_release_-_kemsley_financial_close_-_28_july_2016_-_uk_final.pdf Wheelabrator Press Release]</ref>..

Revision as of 07:52, 17 March 2021


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Error: no local variable "epr" has been set.
Operator [[Error: no local variable "operator" has been set.]]
Region [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]]
Operational Capacity Error: no local variable "cap" has been set.ktpa
Is site R1? Error: no local variable "r1" has been set.
When was R1 Granted? Error: no local variable "r1date" has been set.
What was the R1 value Error: no local variable "r1value" has been set.
Electrical Capacity Error: no local variable "mwe" has been set.MWe
Number of Lines Error: no local variable "line" has been set.
Number of Turbines Error: no local variable "turbine" has been set.
CHP Error: no local variable "chp" has been set.
Technology Approach Error: no local variable "techtype" has been set.
Funding Type [[Error: no local variable "funding" has been set.]]

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Kemsley K3 EFW - Whhelabrator website July 2020 all rights reserved
Kemsley K3 EFW - Whhelabrator website July 2020 all rights reserved


Summary

An EfW facility based upon conventional combustion technology and presently in late stage construction. Kemsley (K3) has a current forecast operational capacity of 550,000 tonnes per annum with plans to extend (see Technology section below). The project has been developed and will be operated by Wheelabrator and was funded by the Green Investment Bank, BTMU, Natixis and Investec. The project reached financial close in September 2016 for GBP £340m[1]..

History

Additional permitted capacity is being sought within the boundaries of the current consent and technology, through improved efficiency of the plant design, to process a further 107,000 tones per annum and generate an additional 25.1MW.

As part of the application to extend the existing capacity, in October 2019, an additional application was made for a further plant, adjacent to Kemsley (K3), called Wheelabrator Kemsley North (WKN). If consented it will deliver a single line of standard moving grate technology, producing super-heated steam and 42MWe from 390,0000 tonnes per annum of residual waste.

Both the K3 and WKN facilities are discrete, and in addition to a planned 'K4' gas-fired CHP facility on the same site. The combined capacity of 'K3', 'K3 extension', and WKN totals 1,047,000 tonnes per annum.

In December 2020 Wheelabrator announced the sale of their UK energy from waste division to the European Diversified Infrastructure Fund III, a fund managed by First Sentier Investors (FSI) (formally known as First State Investments) headquartered in Australia[2] for completion in early 2021.

Technology

The plant technology will comprise 2 lines of a standard moving grate technology, producing super-heated steam and 49.9MW of electricity to grid and steam to the adjacent DS Smith papermill.

Construction

The plant gained planning consent in 2012, reached financial close in July 2016, and will delivered by an EPC turnkey arrangement with CNIM. An operational date is programmed for mid 2020 [3].

Waste Input

The plant is intended to run on residual Household Waste and Commercial Waste sourced by Wheelabrator.