Ketton Cement Kiln: Difference between revisions
No edit summary |
|||
| Line 20: | Line 20: | ||
==Waste Used on Site== | ==Waste Used on Site== | ||
The Ketton site waste return to the [[EA]] for the most recent year showed the following wastes used on site: | The Ketton site waste return to the [[EA]] for the most recent year showed the following wastes used on site: | ||
{{ | {{EAIn|EPR=BM0486IT}} | ||
{{NHLFTable|Permit=BM0486IT}} | |||
Around 90% of the tonnage listed was used for the primary purpose of substituting fuel requirements in the plant, with coal fly ash (also called Pulverized Fuel Ash or [[PFA]]) used as a replacement for raw material in the production process. Hanson intend to 'continuously increase' the use of alternatives as part of their 2030 commitments<ref>[https://www.hanson-communities.co.uk/en/sites/ketton-community-page Hanson/Ketton Community Website]</ref>. | Around 90% of the tonnage listed was used for the primary purpose of substituting fuel requirements in the plant, with coal fly ash (also called Pulverized Fuel Ash or [[PFA]]) used as a replacement for raw material in the production process. Hanson intend to 'continuously increase' the use of alternatives as part of their 2030 commitments<ref>[https://www.hanson-communities.co.uk/en/sites/ketton-community-page Hanson/Ketton Community Website]</ref>. | ||
==References== | ==References== | ||
<references /> | <references /> | ||