Sedgemoor District Council: Difference between revisions
Arctellion (talk | contribs) Page update changes |
Page update changes |
||
Line 4: | Line 4: | ||
== Demographic Information == | == Demographic Information == | ||
GSSCode: E07000188 | GSSCode: {{#vardefine:gss| E07000188}}{{#var:gss}} | ||
Authority Type: DIS<ref>Authority Type Abreviations: | Authority Type: DIS<ref>Authority Type Abreviations: |
Revision as of 09:11, 10 March 2021
Sedgemoor District
Demographic Information
GSSCode: E07000188
Authority Type: DIS[1]
Country: England
Region: South West
Disposal Authority: Somerset Waste Partnership
Population[2] | 0 |
Land Area (ha)[3] | 0 |
Population per ha | 0 |
Collections Contract Information[4]
Collection Arrangements
Primary[5]
Residual Collection: Fortnightly
Dry Recycleables: Weekly : Separate
- Method of Segregation[6]: To be completed by Local Authority
Green Waste: Fortnightly : Separate : Charged
Secondary[7]
Residual Collection: To be completed by Authority
Dry Recycleables: To be completed by Authority
- Method of Segregation[6]: To be completed by Authority
Green Waste: To be completed by Authority
Food Waste: To be completed by Authority
Contract Arrangements
Residual Waste Collection: OutSourced (Kier)
Mixed Recycling Collections: OutSourced (Kier)
Organic Waste Collection: OutSourced (Kier)
Food Waste Collection: OutSourced (Kier)
Duration of Contract: 5
Contract Start Date: 2013
Approximate Value: £14,100,000
Comments
Part of SWP with Mendip DC, Somerset West and Taunton Council and South Somerset DC. New contract with Suez UK Ltd commencing 1 Apr 2020. £210m over 10yrs. 10yr Extension available.
Destination Information
Significant Tonnage Summary[8]
Stream | Facility | Operator | Address | Material | Tonnes |
---|
For further destination information see Disposal Authority (Somerset Waste Partnership.)
References
- ↑ Authority Type Abreviations:
- UTA - Unitary Authority
- DIS - District
- MTD - Metropolitan District
- LBO - London Borough
- CTY - County Council
- ↑ Source: ONS mid 2018 projection
- ↑ Source: Ordnance Survey boundry line data 2019
- ↑ Data initially populated from propriatory database.
- ↑ These arrangements are for the primary arrangements in an area. Primary is defined as the arrangements given to the most households in an area.
- ↑ 6.0 6.1 This should detail the Kerbside Collection Scheme operated by the LA e.g. co-mingled, twin stream or source segregated.
- ↑ Due to the diverse nature of housing stock within a local authority's juristriction most LAs operate secondary collection arrangements to accommodate for this difference in housing e.g. houses, flats etc
- ↑ Tonnages under 2000 tonnes have been screened out.