Lostock Sustainable Energy Plant: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
m add new link
Arctellion (talk | contribs)
No edit summary
Line 1: Line 1:
[[File:Lostock.png|350px|left|Image of Lostock EFW]]
{{#vardefine:epr|WP3934AK}}[[Category:EfW Plants]]
[[Category:EfW Plants]]
An [[EfW]] facility based upon conventional combustion technology and presently in early stage construction. Lostock has a forecast operational capacity of 600,000 tonnes per annum. The project is owned by joint venture company [[Lostock Sustainable Energy Plant Ltd]] - an arrangement between [[Copenhagen Infrastructure Partners]] (60%) and [[FCC Environment]] (40%) with the original developer [[Tata Steel]] 'remaining a participant'.{{EfWTemplate|EPR={{#var:epr}}|id=46}}[[File:Lostock.png|350px|left|Image of Lostock EFW]]__TOC__<br clear='left' />
{{EfWTemplate|EPR=WP3934AK|id=46}}


==Summary==
==Summary==

Revision as of 12:18, 7 May 2021

An EfW facility based upon conventional combustion technology and presently in early stage construction. Lostock has a forecast operational capacity of 600,000 tonnes per annum. The project is owned by joint venture company Lostock Sustainable Energy Plant Ltd - an arrangement between Copenhagen Infrastructure Partners (60%) and FCC Environment (40%) with the original developer Tata Steel 'remaining a participant'.

Lostock Sustainable Energy Plant
Under Construction
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence WP3934AK
Operator Lostock Sustainable Energy Plant Ltd
Region North West
Operational Capacity 600ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 90.00MWe
Number of Lines 0
Number of Turbines 0
CHP No
Technology Approach EfW
Funding Type Merchant

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%

Image of Lostock EFW
Image of Lostock EFW


Summary

An EfW facility based upon conventional combustion technology and presently in early stage construction. Lostock has a forecast operational capacity of 600,000 tonnes per annum. The project is owned by joint venture company Lostock Sustainable Energy Plant Ltd - an arrangement between Copenhagen Infrastructure Partners (60%) and FCC Environment (40%) with the original developer Tata Steel 'remaining a participant'.

Technology

The plant technology will comprise 2 lines of a standard moving grate technology, producing super-heated steam and 60MWe[1]

Construction

The plant gained planning consent in 2012, reached financial close in March 2019, and will delivered by an EPC turnkey arrangement with CNIM. An operational date is programmed for Q2 2023[2].

Waste Input

The plant is intended to run on residual Household Waste and Commercial Waste provided by FCC Environment.

References