Avonmouth RRC: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
m add new link
Arctellion (talk | contribs)
No edit summary
Line 1: Line 1:
[[Category:EfW Plants]]
{{#vardefine:epr|SP3301LA}}[[Category:EfW Plants]]
{{EfWTemplate|EPR=SP3301LA|id=50}}
An [[EfW]] facility based upon conventional [[combustion]] technology, [[Avonmouth RRC]] has a forecast operational capacity of 320,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility will processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/avonmouth-rrc/ Viridor Website]</ref>
[[File:Avonmouth RRC.png|350px|left|Avonmouth Energy Recovery Facility - picture from Viridor website all rights reserved]]__TOC__
{{EfWTemplate|EPR={{#var:epr}}|id=50}}[[File:Avonmouth RRC.png|350px|left|Avonmouth Energy Recovery Facility - picture from Viridor website all rights reserved]]__TOC__<br clear='left'/>
<br clear='left'/>
==Summary==
==Summary==
An [[EfW]] facility based upon conventional [[combustion]] technology, [[Avonmouth RRC]] has a forecast operational capacity of 320,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility will processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/avonmouth-rrc/ Viridor Website]</ref>
An [[EfW]] facility based upon conventional [[combustion]] technology, [[Avonmouth RRC]] has a forecast operational capacity of 320,000 tonnes per annum, operated and owned by [[Viridor]]. Delivery of waste is by road and the facility will processes primarily residual [[Household Waste]] and some [[Commercial Waste]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/avonmouth-rrc/ Viridor Website]</ref>
Line 14: Line 13:


==Local Authority Users==
==Local Authority Users==
 
{{EfWLAData|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />

Revision as of 12:58, 4 May 2021

An EfW facility based upon conventional combustion technology, Avonmouth RRC has a forecast operational capacity of 320,000 tonnes per annum, operated and owned by Viridor. Delivery of waste is by road and the facility will processes primarily residual Household Waste and some Commercial Waste[1]


Severn Road Resource Recovery Centre
Operational
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence SP3301LA
Operator Viridor
Region South West
Operational Capacity 377ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.79
Electrical Capacity 34.00MWe
Number of Lines 2
Number of Turbines 1
CHP No
Technology Approach EfW
Funding Type Merchant

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total
2016 0.00 0.00 0.00 0.00 0.00
2017 0.00 0.00 0.00 0.00 0.00
2018 0.00 0.00 0.00 0.00 0.00
2019 0.00 0.00 0.00 0.00 0.00
2020 62242.00 5560.00 0.00 0.00 67802.00
2021 224024.00 61194.00 0.00 0.00 285218.00
2022 285872.00 77959.00 0.00 0.00 363831.00
2023 115810.00 274720.00 0.00 0.00 390530.00


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2016 0.00 0.00% 0.00 0.00%
2017 0.00 0.00% 0.00 0.00%
2018 0.00 0.00% 0.00 0.00%
2019 0.00 0.00% 0.00 0.00%
2020 13125.00 19.36% 3018.00 4.45%
2021 54483.00 19.10% 6375.00 2.24%
2022 73948.00 20.32% 7135.00 1.96%
2023 80372.00 20.58% 735.00 0.19%

Avonmouth Energy Recovery Facility - picture from Viridor website all rights reserved
Avonmouth Energy Recovery Facility - picture from Viridor website all rights reserved


Summary

An EfW facility based upon conventional combustion technology, Avonmouth RRC has a forecast operational capacity of 320,000 tonnes per annum, operated and owned by Viridor. Delivery of waste is by road and the facility will processes primarily residual Household Waste and some Commercial Waste[2]

History

The Avonmouth RRC facility started construction in summer 2017 and has secured tonnage from Somerset Waste Partnership through the extension of their existing PPP of around 100,000 tonnes per annum and secured[3] tonnage through competitive tender for Residual Waste from the West of England Partnership, replacing the existing PPP contract with New Earth Solutions/Panda MBT plant. The balance of the West of England Partnership Residual Waste tonnage for EfW of 50,000 tonnes per annum has been secured by Suez facility at its Riverside Resource Recovery Facility (RRRF), located close to the Avonmouth RRC facility.

Plant

The plant was built by a JV between CNIM and Clugson (although Clugson went into administration in December 2019[4]) and the plant was handed over by CNIM to Viridor in December 2020[5] under a Design & Build EPC-turnkey contract at a cost of £252m. The plant is assumed to be similar to Viridor's Ardley EfW, comprising 2 lines of 20 tonnes/hour design capacity capable of treating 300,000 tonnes per annum via standard combustion technology Martin Reverse Acting Grate, generating super-heated steam, configured to run on primarily residual Household Waste.

Local Authority Users

Local Authority Data

The table below lists those local authorities who have recorded their tonnage on WasteDataFlow as sending their Waste to this site (either directly or via a transfer station) for the most recent financial year, data was updated on Error: no local variable "updated" has been set.. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 0t

A 'zero return' or a below expected return, when compared to the EA Data below indicates that either:

  • no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or
  • a result of the plant being recently commissioned and actually having received no tonnage or
  • a lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated or
  • it may be a new plant being in 'ramp up' towards full capacity after construction or
  • may be a result of plant shut down and subsequent re-start in a year or
  • the local authority may not have correctly entered the site's details on WasteDataFlow


Authority Tonnage

References