Charlton Lane Eco Park (ACT): Difference between revisions
m add new link |
Arctellion (talk | contribs) No edit summary |
||
| Line 1: | Line 1: | ||
[[ | {{#vardefine:epr|XP3632HX}} | ||
[[ | [[Category:EfW Plants]]An [[EfW]] facility based upon [[Gasification]] technology with [[AD]], a [[MRF]] bulking facility and an [[HWRC]] on the same site. The Charlton Lane site (also known as Surrey Eco Park) has forecast operational capacity of 60,000 tonnes per annum for the [[Gasification]] alone (with around 40,000 tonnes per annum in the [[AD]] plant). It was reported that the first waste for hot commissioning was accepted in late 2019 with the [[Gasification]] facility now entering final stages of commissioning<ref>[https://www.ecoparksurrey.uk/news/updates/november-to-december-2019-local-stakeholder-update EcoPark Surrey Website]</ref>.{{EfWTemplate|EPR={{#var:epr}}|id=66}}[[File:Charlton Lane.png|400px|left|Suez Picture of Charlton Lane Site]]__TOC__<br clear='left' /> | ||
{{EfWTemplate|EPR= | |||
==Summary== | ==Summary== | ||