Residual Waste EFW: Difference between revisions
No edit summary |
|||
| Line 5: | Line 5: | ||
==Operational EfW== | ==Operational EfW== | ||
{{#clear_external_data:}} | {{#clear_external_data:}} | ||
{{#get_db_data: db=engy|from=efwdb | where=status='Operational' | data=tton=sum(cap)}} | {{#get_db_data: db=engy|from=efwdb | where=status='Operational' | data=tton=sum(cap)}} | ||
| Line 126: | Line 125: | ||
==Under Construction EfW== | ==Under Construction EfW== | ||
{{#clear_external_data:}} | {{#clear_external_data:}} | ||
{{#get_db_data: db=engy |from=efwdb |where=status='Under Construction'|data= | {{#get_db_data: db=engy|from=efwdb | where=status='Under Construction' | data=tton=sum(cap)}} | ||
The following list summarises all [[EfW]] sites that were under construction in March 2021, with limited summary information in the table and more detailed information by clicking through to the site-specific page . Historically there have been some plants that have not passed from construction to operation due to commissioning issues and are not listed i.e. [[Air Products]]. Several of the plants listed below that are presently in extended commissioning are based on [[Gasification]] technologies, but no comment is made as to whether they will reach full operational capacity. The total 'plated capacity' is '''5,714,000 tonnes'''. | The following list summarises all [[EfW]] sites that were under construction in March 2021, with limited summary information in the table and more detailed information by clicking through to the site-specific page . Historically there have been some plants that have not passed from construction to operation due to commissioning issues and are not listed i.e. [[Air Products]]. Several of the plants listed below that are presently in extended commissioning are based on [[Gasification]] technologies, but no comment is made as to whether they will reach full operational capacity. The total 'plated capacity' is '''5,714,000 tonnes'''. '''{{formatnum: {{#external_value:tton}} kt''' | ||
[[File:Under Construction EfW UK.png|600px|right|Under Construction EfW within the UK.]] | [[File:Under Construction EfW UK.png|600px|right|Under Construction EfW within the UK.]] | ||
{{#clear_external_data:}} | |||
{{#get_db_data: db=engy |from=efwdb |where=status='Under Construction'|data=site=site,id=id,cap=cap}} | |||
{|Class="wikitable" | {|Class="wikitable" | ||
! ID !! Site Name !! Capacity (kt) | ! ID !! Site Name !! Capacity (kt) | ||
| Line 145: | Line 148: | ||
==In Planning EfW== | ==In Planning EfW== | ||
{{#clear_external_data:}} | {{#clear_external_data:}} | ||
{{#get_db_data: db=engy |from=efwdb |where=status='Planning' | {{#get_db_data: db=engy|from=efwdb | where=status='Planning' | data=tton=sum(cap)}} | ||
The following list summarises all [[EfW]] sites that were in the planning process as at March 2021, which comprises those that have received [[Planning Permission|planning permission]] at some point and those that are presently in the consultation process seeking [[Planning Permission|planning permission]]. The total 'plated capacity' shown in the tables below is '''25,051,000 tonnes'''. In the case of Lakeside this planned capacity would replace the existing site, linked to the development of the third runway at [[wikipedia:Heathrow Airport|Heathrow Airport]]. | The following list summarises all [[EfW]] sites that were in the planning process as at March 2021, which comprises those that have received [[Planning Permission|planning permission]] at some point and those that are presently in the consultation process seeking [[Planning Permission|planning permission]]. The total 'plated capacity' shown in the tables below is '''25,051,000 tonnes''' (Planning: '''{{formatnum: {{#external_value:tton}}}} kt'''). In the case of Lakeside this planned capacity would replace the existing site, linked to the development of the third runway at [[wikipedia:Heathrow Airport|Heathrow Airport]]. | ||
In addition there are some plants below which have been reported as commencing construction, but this only applied to initial works or the construction of adjacent infrastructure, and not the [[EfW]] element of the project. The sites that fall into this category (i.e. the [[EfW]] is not thought to be under construction) in the list below include ID numbers 53, 59, 60, 63, 65, and 68. | In addition there are some plants below which have been reported as commencing construction, but this only applied to initial works or the construction of adjacent infrastructure, and not the [[EfW]] element of the project. The sites that fall into this category (i.e. the [[EfW]] is not thought to be under construction) in the list below include ID numbers 53, 59, 60, 63, 65, and 68. | ||
| Line 154: | Line 158: | ||
[[File:Efwplan.png|600px|right|EfW Sites within UK in Planning]] | [[File:Efwplan.png|600px|right|EfW Sites within UK in Planning]] | ||
===In Planning=== | ===In Planning=== | ||
{{#clear_external_data:}} | |||
{{#get_db_data: db=engy |from=efwdb |where=status='Planning' and cap > 0 |data=site=site,id=id,cap=cap}} | |||
{|Class="wikitable" | {|Class="wikitable" | ||
! ID !! Site Name !! Capacity (kt) | ! ID !! Site Name !! Capacity (kt) | ||