Template:EfWLAData: Difference between revisions

Created page with "The following represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directl..."
 
Bin52 (talk | contribs)
m minor text change
Line 1: Line 1:
The following  represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
The following  represents those [[Local Authority|local authorities]] recorded as putting tonnage (either directly or via a [[Transfer Station|transfer station]]) into the site on [[WasteDataFlow]] for the financial year 2019/20 and for Scotland for the calendar year 2019. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no [[Local Authority|local authority]] tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a [[Local Authority|local authority]]) or a result of the plant being recently commissioned and actually having received no tonnage. Additionally, lower than expected tonnage maybe a result of a [[Local Authority|local authority]] splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated, or it may be a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{#clear_external_data:}}
{{#clear_external_data:}}
{{#get_db_data: db=engy
{{#get_db_data: db=engy