Edmonton EcoPark EfW: Difference between revisions

No edit summary
No edit summary
Line 1: Line 1:
{{#vardefine:epr|YP3033BE}}
{{#vardefine:epr|YP3033BE}}
[Category:EfW Plants]]
[[Category:EfW Plants]]
An [[EfW]] facility based upon conventional combustion technology which is considered an [[ERF]] as a result of having [[R1]] status. Edmonton has permitted operational capacity of 675,000 tonnes per annum (although reported also at 500,000 tonnes per annum), operated by [[LondonEnergy]], a local authority owned company formally known as [[LondonWaste]]. Delivery of waste is by road, with easy connection from the North Circular road in Enfield, and the facility processes primarily residual [[Household Waste]] similar residual [[Commercial Waste]] as well as other waste infrastructure on the site.
An [[EfW]] facility based upon conventional combustion technology which is considered an [[ERF]] as a result of having [[R1]] status. Edmonton has permitted operational capacity of 675,000 tonnes per annum (although reported also at 500,000 tonnes per annum), operated by [[LondonEnergy]], a local authority owned company formally known as [[LondonWaste]]. Delivery of waste is by road, with easy connection from the North Circular road in Enfield, and the facility processes primarily residual [[Household Waste]] similar residual [[Commercial Waste]] as well as other waste infrastructure on the site.
{{EfWTemplate|EPR={{#var:epr}}|id=5}}
{{EfWTemplate|EPR={{#var:epr}}|id=5}}