Edmonton EcoPark EfW: Difference between revisions
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
{{#vardefine:epr|YP3033BE}} | {{#vardefine:epr|YP3033BE}} | ||
[Category:EfW Plants]] | [[Category:EfW Plants]] | ||
An [[EfW]] facility based upon conventional combustion technology which is considered an [[ERF]] as a result of having [[R1]] status. Edmonton has permitted operational capacity of 675,000 tonnes per annum (although reported also at 500,000 tonnes per annum), operated by [[LondonEnergy]], a local authority owned company formally known as [[LondonWaste]]. Delivery of waste is by road, with easy connection from the North Circular road in Enfield, and the facility processes primarily residual [[Household Waste]] similar residual [[Commercial Waste]] as well as other waste infrastructure on the site. | An [[EfW]] facility based upon conventional combustion technology which is considered an [[ERF]] as a result of having [[R1]] status. Edmonton has permitted operational capacity of 675,000 tonnes per annum (although reported also at 500,000 tonnes per annum), operated by [[LondonEnergy]], a local authority owned company formally known as [[LondonWaste]]. Delivery of waste is by road, with easy connection from the North Circular road in Enfield, and the facility processes primarily residual [[Household Waste]] similar residual [[Commercial Waste]] as well as other waste infrastructure on the site. | ||
{{EfWTemplate|EPR={{#var:epr}}|id=5}} | {{EfWTemplate|EPR={{#var:epr}}|id=5}} | ||