Glasgow Renewable Energy and Recycling Centre (ACT): Difference between revisions
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) No edit summary |
||
Line 11: | Line 11: | ||
Originally built by [[Interserve]] under an [[EPC]] contract which started in 2013 (with a 2016 completion date) with the [[Gasification]] technology delivered by [[Energos]], the contract was terminated due to 'repeated delays', and was completed by [[Doosan Babcock]] in late summer 2019. Originally estimated to cost £154m by Viridor, they reported an over run of £95m <ref>[https://www.mrw.co.uk/latest/viridor-to-lose-95m-on-its-glasgow-efw-project/10029534.article MRW Article]</ref>,. Due to the accumulated losses by [[Interserve]] on this project and the [[Sinfin Lane]] project led to [[Interserve]] exciting the [[EfW]] market in early 2017<ref>[https://www.letsrecycle.com/news/latest-news/interserve-to-be-investigated-over-efw-exit/ Letsrecycle Article]</ref> | Originally built by [[Interserve]] under an [[EPC]] contract which started in 2013 (with a 2016 completion date) with the [[Gasification]] technology delivered by [[Energos]], the contract was terminated due to 'repeated delays', and was completed by [[Doosan Babcock]] in late summer 2019. Originally estimated to cost £154m by Viridor, they reported an over run of £95m <ref>[https://www.mrw.co.uk/latest/viridor-to-lose-95m-on-its-glasgow-efw-project/10029534.article MRW Article]</ref>,. Due to the accumulated losses by [[Interserve]] on this project and the [[Sinfin Lane]] project led to [[Interserve]] exciting the [[EfW]] market in early 2017<ref>[https://www.letsrecycle.com/news/latest-news/interserve-to-be-investigated-over-efw-exit/ Letsrecycle Article]</ref> | ||
{{EfWLAData|EPR={{#var: epr}}}} | {{EfWLAData|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references /> | <references /> |