Brigg REP: Difference between revisions
→Summary: update on procurement of project by Octopus |
No edit summary |
||
Line 1: | Line 1: | ||
{{BiomassPlant|NAME=Brigg |id=16}} | {{BiomassPlant|NAME=Brigg |id=16}}{{#vardefine: epr|RP3638CG}} | ||
[[Category:Biomass EfW Plants]] | [[Category:Biomass EfW Plants]] | ||
[[File:Brigg-picture.png|400px|left|Brigg Biomass EFW - source cipartners.dk]]__TOC__ | [[File:Brigg-picture.png|400px|left|Brigg Biomass EFW - source cipartners.dk]]__TOC__ |
Revision as of 09:37, 1 August 2022
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Biomass EfW → page for a larger UK Wide map. | |
Operator | Error: no local variable "operator" has been set. |
Capacity | Error: no local variable "capacity" has been set. MWe |
Feedstock | Error: no local variable "mainfeed" has been set. |
EPR (Waste Licence) | Error: no local variable "epr" has been set. |
ROC | Error: no local variable "roc" has been set. |
CfD | Error: no local variable "cfdcap" has been set. |
CHP | Error: no local variable "chp" has been set. |
Operators Annual Report
Input Data
Year | Wood | Litter | RDF | Other | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
A Biomass Waste EFW facility processing up to 250,000 tonnes per year of a range of Biomass, but primarily straw and a limited amount of Wood Waste to generate up to 40MWe for export to the national grid[2]. The straw fuel is supplied under a 12 year agreement with Worldwide Farming Partnership (WFP) as well as other local and regional farmers.
The plant was originally jointly owned by Burmeister & Wain Scandinavian Contractor A/S (BWSC) and Copenhagen Infrastructure Partners K/S (CIP), with senior debt refinancing completed in 2017 of £250m (including Royal Bank of Scotland, Investec, Aviva Investors and others) but in April 2021 it was confirmed that Octopus Renewables had bought the facility from the joint investors for an undisclosed fee[3].
Plant
Built under an EPC contract with Burmeister & Wain Scandinavian Contractor A/S (BWSC), construction commenced in early 2014 and commissioning and first power was delivered at the end of 2015 and formal opening in January 2016.
Tonnage Input/Fuel
The tonnage received by the plant is a mixture of Biomass and in the most recent Annual Sustainability Report for 2018-19[4] Ofgem reported the following fuel received (Wood Waste representing 8% of input):
Biomass | Tonnage (2018-19) |
---|---|
Wood Waste | 15,239 |
Straw | 132,339 |
Miscanthus | 23,755 |
Sawmill Residues | 2,308 |
Arboriculture and Forestry Residues | 19,638 |
Short Rotation Coppice | 3,835 |
Other (Olive Pellets) | 4,968 |
Total | 202,082 |
The Wood Waste tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) although no waste tonnage was recorded by the site in the waste returns.
References
- ↑ Brigg Biomass EfW Site PhotoAll Rights Reserved
- ↑ Brigg website
- ↑ ENDS April 2021
- ↑ Biomass Sustainability Dataset 2018-19