Wolverhampton EfW: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Arctellion (talk | contribs)
No edit summary
Line 8: Line 8:
==Plant==
==Plant==
The plant comprises two lines via standard [[combustion]] [[CNIM]] boilers, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability of 7 tonnes per hour or up to 115,000 tonnes per annum and generating 8 MWe.
The plant comprises two lines via standard [[combustion]] [[CNIM]] boilers, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]] and similar residual [[Commercial Waste]] with design capability of 7 tonnes per hour or up to 115,000 tonnes per annum and generating 8 MWe.
==Local Authority Users==
 
{{EfWLAData|EPR={{#var: epr}}}}
{{EfWLAData|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />