Newlincs EfW: Difference between revisions
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) No edit summary |
||
| Line 1: | Line 1: | ||
{{#vardefine:epr|BT4249IB}} | {{#vardefine:epr|BT4249IB}}[[Category:EfW Plants]] | ||
[[Category:EfW Plants]] | An [[EfW]] facility based upon conventional combustion technology and not considered an [[ERF]] as yet based upon it not having [[R1]] status. Newlincs has permitted operational capacity of 60,000 tonnes per annum, owned and operated by [[Cyclerval-UK]]. Delivery of waste is by road and the facility processes primarily residual [[Household Waste]].{{EfWTemplate|EPR={{#var:epr}}|id=43}}[[File:Cyclerval Newlincs.png|350px|left|Cyclerval New Lincs: Attributed to Alan Murray-Rust, CC BY-SA 2.0]]__TOC__<br clear='left' /> | ||
{{EfWTemplate|EPR={{#var:epr}}|id=43}}[[File:Cyclerval Newlincs.png|350px|left|Cyclerval New Lincs: Attributed to Alan Murray-Rust, CC BY-SA 2.0]] | |||
==Summary== | ==Summary== | ||