The plant comprises of one line with a design capacity capable of treating 60,000 tonnes per annum via standard combustion technology comprising an oscillating kiln, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]]. Power output design is reported is 4MWe for [[Exeter Energy Recovery Facility|Exeter]], but electrical capacity is shown as 3.2MWe, consistent with other reported figures. | The plant comprises of one line with a design capacity capable of treating 60,000 tonnes per annum via standard combustion technology comprising an oscillating kiln, generating super-heated steam, and is configured to run on primarily residual [[Household Waste]]. Power output design is reported is 4MWe for [[Exeter Energy Recovery Facility|Exeter]], but electrical capacity is shown as 3.2MWe, consistent with other reported figures. | ||
{{EfWLAData|EPR={{#var: epr}}}} | {{EfWLAData|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references /> | <references /> |
Latest revision as of 19:18, 18 June 2021
An EfW facility based upon conventional combustion technology and not considered an ERF as yet based upon it not having R1 status. Newlincs has permitted operational capacity of 60,000 tonnes per annum, owned and operated by Cyclerval-UK. Delivery of waste is by road and the facility processes primarily residual Household Waste.
Newlincs EfW Operational | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | BT4249IB |
Operator | Newlincs Developments, TIRU |
Region | Yorkshire and the Humber |
Operational Capacity | 56ktpa |
Is site R1? | fal |
When was R1 Granted? | |
What was the R1 value | 0.00 |
Electrical Capacity | 3.20MWe |
Number of Lines | 1 |
Number of Turbines | 1 |
CHP | Yes |
Technology Approach | EfW |
Funding Type | PPP |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|---|---|---|---|---|
2016 | 54855.00 | 0.00 | 0.00 | 0.00 | 54855.00 |
2017 | 54363.00 | 0.00 | 0.00 | 0.00 | 54363.00 |
2018 | 42967.00 | 8513.00 | 0.00 | 0.00 | 51480.00 |
2019 | 44508.00 | 6755.00 | 0.00 | 0.00 | 51263.00 |
2020 | 53004.00 | 1163.00 | 0.00 | 0.00 | 54167.00 |
2021 | 49039.00 | 2282.00 | 0.00 | 0.00 | 51321.00 |
2022 | 47868.00 | 3381.00 | 0.00 | 0.00 | 51249.00 |
2023 | 50197.00 | 5504.00 | 0.00 | 0.00 | 55701.00 |
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|---|---|---|---|
2016 | 9396.00 | 17.13% | 2690.00 | 4.90% |
2017 | 9023.00 | 16.60% | 2500.00 | 4.60% |
2018 | 8019.00 | 15.58% | 2250.00 | 4.37% |
2019 | 8017.00 | 15.64% | 2355.00 | 4.59% |
2020 | 8832.00 | 16.31% | 2403.00 | 4.44% |
2021 | 8359.00 | 16.29% | 2069.00 | 4.03% |
2022 | 7760.00 | 15.14% | 1770.00 | 3.45% |
2023 | 8280.00 | 14.87% | 2185.00 | 3.92% |
Summary
An EfW facility based upon conventional combustion technology and not considered an ERF as yet based upon it not having R1 status. Newlincs has permitted operational capacity of 60,000 tonnes per annum, owned and operated by Cyclerval-UK. Delivery of waste is by road and the facility processes primarily residual Household Waste.
History
The Newlincs facility was built primarily to service a 25 year PPP contract signed in 1999 with North East Lincolnshire Council, with anticipated total throughput of up to 56,000 tonnes per annum[1]. The site is located between Grimsby and Immingham.
Plant
Built by TIRU SA (now part of Dalkia[2], part of the EDF Group) under a Design & Build EPC-turnkey contract which was delivered and operational in 2003 it is similar to the Exeter. The plant comprises of one line with a design capacity capable of treating 60,000 tonnes per annum via standard combustion technology comprising an oscillating kiln, generating super-heated steam, and is configured to run on primarily residual Household Waste. Power output design is reported is 4MWe for Exeter, but electrical capacity is shown as 3.2MWe, consistent with other reported figures.
Local Authority Data
The table below lists those local authorities who have recorded their tonnage on WasteDataFlow as sending their Waste to this site (either directly or via a transfer station) for the most recent financial year, data was updated on 2023-04-26. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the EA statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total Local Authority waste received by the plant in the period was: 47,740.4t
A 'zero return' or a below expected return, when compared to the EA Data below indicates that either:
- no local authority tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a local authority) or
- a result of the plant being recently commissioned and actually having received no tonnage or
- a lower than expected tonnage maybe a result of a local authority splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated or
- it may be a new plant being in 'ramp up' towards full capacity after construction or
- may be a result of plant shut down and subsequent re-start in a year or
- the local authority may not have correctly entered the site's details on WasteDataFlow
Authority | Tonnage |
---|---|
North East Lincolnshire Council | 41572.300 |
North Lincolnshire Council | 6168.100 |
Waste Tonnage, By Origin
The table shows a list of the Waste for the Permit BT4249IB, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was last updated on October 2024. The total reported tonnage arriving at the site was: 56,705.8t.
Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:
- Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
- Material may have been received into the site but treated in some other way than incineration.
- Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code | Origin of Waste | Tonnes In |
---|---|---|
20 03 01 | North East Lincolnshire | 47028.92 |
20 03 02 | North East Lincolnshire | 35.82 |
18 01 04 | North East Lincolnshire | 126.96 |
19 12 12 | North Lincolnshire | 9.68 |
20 03 01 | North Lincolnshire | 9504.42 |