Millerhill EfW: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Arctellion (talk | contribs)
No edit summary
Line 16: Line 16:
FCC Environment appointed [[Hitachi Zosen Inova]] (HZI)<ref>[https://www.hz-inova.com/projects/edinburgh-efw/ Hitachi Zosen Inova Website]</ref> and FCC Medio Ambiente SA to undertake the Engineering, Procurement and Construction (EPC) and to supply the technology utilised in the plant as a joint venture, costing £142m to develop<ref name="ref1" />. Millerhill EfW is co-located with a materials recycling facility.
FCC Environment appointed [[Hitachi Zosen Inova]] (HZI)<ref>[https://www.hz-inova.com/projects/edinburgh-efw/ Hitachi Zosen Inova Website]</ref> and FCC Medio Ambiente SA to undertake the Engineering, Procurement and Construction (EPC) and to supply the technology utilised in the plant as a joint venture, costing £142m to develop<ref name="ref1" />. Millerhill EfW is co-located with a materials recycling facility.


==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}
{{EfWLAData|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}
==References==
==References==
<references />
<references />