Millerhill EfW: Difference between revisions
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) No edit summary |
||
| Line 16: | Line 16: | ||
FCC Environment appointed [[Hitachi Zosen Inova]] (HZI)<ref>[https://www.hz-inova.com/projects/edinburgh-efw/ Hitachi Zosen Inova Website]</ref> and FCC Medio Ambiente SA to undertake the Engineering, Procurement and Construction (EPC) and to supply the technology utilised in the plant as a joint venture, costing £142m to develop<ref name="ref1" />. Millerhill EfW is co-located with a materials recycling facility. | FCC Environment appointed [[Hitachi Zosen Inova]] (HZI)<ref>[https://www.hz-inova.com/projects/edinburgh-efw/ Hitachi Zosen Inova Website]</ref> and FCC Medio Ambiente SA to undertake the Engineering, Procurement and Construction (EPC) and to supply the technology utilised in the plant as a joint venture, costing £142m to develop<ref name="ref1" />. Millerhill EfW is co-located with a materials recycling facility. | ||
{{EfWLAData|EPR={{#var: epr}}}} | {{EfWLAData|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references /> | <references /> | ||