Binn Eco Park EFW: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Arctellion (talk | contribs)
No edit summary
Line 1: Line 1:
{{#vardefine:epr|Tbc#09}}[[Category:EfW Plants]]
{{#vardefine:epr|Tbc09}}[[Category:EfW Plants]]


An [[EfW]] facility based upon conventional [[combustion]] technology that was granted [[Planning Permission|planning permission]] in December 2020 and has a permitted capacity of 84,900 tonnes per annum. This consent replaced an earlier consent for a [[gasification]] technology with a capacity of 60,000 tonnes per annum.  
An [[EfW]] facility based upon conventional [[combustion]] technology that was granted [[Planning Permission|planning permission]] in December 2020 and has a permitted capacity of 84,900 tonnes per annum. This consent replaced an earlier consent for a [[gasification]] technology with a capacity of 60,000 tonnes per annum.