Swindon Energy Plant: Difference between revisions

From Wikiwaste
Arctellion (talk | contribs)
No edit summary
Arctellion (talk | contribs)
No edit summary
 
Line 1: Line 1:
{{#vardefine:epr|Tbc#18}}[[Category:EfW Plants]]
{{#vardefine:epr|Tbc18}}[[Category:EfW Plants]]
An [[EfW]] facility originally based upon [[Gasification]] technology. Consented on [[Crapper and Sons]] [[Landfill]] site in Wootton Basset, as part of a number of other facilities including a [[Biomass]] project from [[Waste Wood]] and a [[Mechanical Treatment]] process. The initial works were reported as commenced, but no construction is understood to have progressed on the site of the [[EfW]] facility to date.
An [[EfW]] facility originally based upon [[Gasification]] technology. Consented on [[Crapper and Sons]] [[Landfill]] site in Wootton Basset, as part of a number of other facilities including a [[Biomass]] project from [[Waste Wood]] and a [[Mechanical Treatment]] process. The initial works were reported as commenced, but no construction is understood to have progressed on the site of the [[EfW]] facility to date.
{{EfWTemplate|EPR={{#var:epr}}|id=65}}__TOC__<br clear='left'/>
{{EfWTemplate|EPR={{#var:epr}}|id=65}}__TOC__<br clear='left'/>

Latest revision as of 08:06, 19 August 2021

An EfW facility originally based upon Gasification technology. Consented on Crapper and Sons Landfill site in Wootton Basset, as part of a number of other facilities including a Biomass project from Waste Wood and a Mechanical Treatment process. The initial works were reported as commenced, but no construction is understood to have progressed on the site of the EfW facility to date.


Swindon Energy Plant
Planning
Site Location
Site Location

See Residual EfW → page for a larger UK Wide map.

Waste Licence Tbc18
Operator Crapper and Sons
Region South West
Operational Capacity 70ktpa
Is site R1? fal
When was R1 Granted?
What was the R1 value 0.00
Electrical Capacity 6.00MWe
Number of Lines 0
Number of Turbines 0
CHP Yes
Technology Approach ACT
Funding Type Merchant

Operators Annual Report


Input Data

Year HH C&I Clin RDF Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN


Summary

An EfW facility originally based upon Gasification technology. Consented on Crapper and Sons Landfill site in Wootton Basset, as part of a number of other facilities including a Biomass project from Waste Wood and a Mechanical Treatment process. The initial works were reported as commenced, but no construction is understood to have progressed on the site of the EfW facility to date.

Technology

The plant was originally designed based on modular Gasification technology.

Construction

There is no information on the current status of funding or construction of the project in the public domain, the company website notes that planning is in place in 2016 but has no other detail[1].

Waste Input

The plant was designed to run on 70,000 tonnes per annum of prepared RDF from an adjacent Mechanical Treatment facility.

References