Eastcroft EfW (3rd Line): Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
m minor text change
Line 13: Line 13:


==Construction==
==Construction==
Awaiting confirmation details from [[FCC Environment]]. The Eastcroft EfW website states that construction was expected to commence in 2020<ref>https://eastcroft.fccenvironment.co.uk/eastcroft-energy-from-waste/</ref>.
Awaiting confirmation details from [[FCC Environment]]. The Eastcroft EfW website states that construction was expected to commence in 2020<ref>https://eastcroft.fccenvironment.co.uk/eastcroft-energy-from-waste/</ref>, although the annual report by FCC states that the construction had not commenced in 2020.


==Waste Input==
==Waste Input==