==Construction== | ==Construction== | ||
The construction groundworks preparation was reported to have commenced in February 2021, with a 4 year construction plan to deliver the plant by the end of 2025<ref>http://www.rivenhall-iwmf.co.uk/2021/02/08/work-to-begin-on-rivenhall-woodhouse-farm-site/</ref> at a cost of £500m<ref name="ref1" />. | The construction groundworks preparation was reported to have commenced in February 2021, with a 4 year construction plan to deliver the plant by the end of 2025<ref>http://www.rivenhall-iwmf.co.uk/2021/02/08/work-to-begin-on-rivenhall-woodhouse-farm-site/</ref> at a cost of £500m<ref name="ref1" />. It was announced that [[Hitachi Zosen Inova]] were appointed as the [[EPC]] contractor with a notice to proceed on the 9th May 2022 with a commercial operations target date of Q1 2026<ref>https://www.hz-inova.com/indaver-signs-hitachi-zosen-inova-as-its-epc-contractor-for-the-construction-of-the-rivenhall-iwmf-and-energy-centre/</ref> | ||
==Waste Input== | ==Waste Input== | ||