Newhurst EFW: Difference between revisions
Arctellion (talk | contribs) No edit summary |
Arctellion (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
{{#vardefine:epr|TP3036KB}}[[Category:EfW Plants]] | {{#vardefine:epr|TP3036KB}}[[Category:EfW Plants]] | ||
An [[EfW]] facility based upon conventional [[combustion]] technology that reached financial close in February 2020. [[Newhurst EFW]] has a permitted capacity of 350,000 tonnes per annum.{{EfWTemplate|EPR={{#var:epr|id=73}}[[File:Newhurst efw artist image.png|350px|left|Newhurst EFW Artist Image - source Circular Online Magazine]]__TOC__<br clear='left'/> | An [[EfW]] facility based upon conventional [[combustion]] technology that reached financial close in February 2020. [[Newhurst EFW]] has a permitted capacity of 350,000 tonnes per annum.{{EfWTemplate|EPR={{#var:epr}}|id=73}}[[File:Newhurst efw artist image.png|350px|left|Newhurst EFW Artist Image - source Circular Online Magazine]]__TOC__<br clear='left'/> | ||
==Summary== | ==Summary== |
Revision as of 12:53, 10 May 2021
An EfW facility based upon conventional combustion technology that reached financial close in February 2020. Newhurst EFW has a permitted capacity of 350,000 tonnes per annum.
Error: no local variable "site" has been set. Error: no local variable "status" has been set. | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "operator" has been set.]] |
Region | [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]] |
Operational Capacity | Error: no local variable "cap" has been set.ktpa |
Is site R1? | Error: no local variable "r1" has been set. |
When was R1 Granted? | Error: no local variable "r1date" has been set. |
What was the R1 value | Error: no local variable "r1value" has been set. |
Electrical Capacity | Error: no local variable "mwe" has been set.MWe |
Number of Lines | Error: no local variable "line" has been set. |
Number of Turbines | Error: no local variable "turbine" has been set. |
CHP | Error: no local variable "chp" has been set. |
Technology Approach | Error: no local variable "techtype" has been set. |
Funding Type | [[Error: no local variable "funding" has been set.]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
An EfW facility based upon conventional combustion technology that reached financial close in February 2020. Newhurst EFW has a permitted capacity of 350,000 tonnes per annum. The project is being developed by Covanta who will be the operator of the facility when constructed. The facility is 50% owned by Covanta and Macquarie's Green Investment Group and 50% by Biffa[1].
Technology
The plant technology will comprise standard moving grate technology, producing super-heated steam, generating 42MWe.
Construction
The plant reached financial close in February 2020 and will delivered under a turnkey EPC arrangement with Hitachi Zosen Inova technology over a 39 month programme with technical oversight by Covanta[2][3].
Waste Input
The plant is intended to run on residual Household Waste and Commercial Waste with 70% provided from Biffa's existing local waste collection services.