Scotia Business Park: Difference between revisions
add page specific text |
Arctellion (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
{{#vardefine: epr|TBC}}[[Category:High Temperature and Clinical Waste Incinerators]] | {{#vardefine: epr|TBC}}[[Category:High Temperature and Clinical Waste Incinerators]] | ||
One of the largest [[High Temperature and Clinical Waste Incineration|Clinical Waste Incinerators]] to built in the UK in the last 20 years, [[Scotia Business Park]] will trade under the brand [[Clinitek]] and is referred to as their '''Stoke-on-Trent''' facility<ref name="P3P1">[https://p3ppartners.com/p3p-partners-are-very-excited-to-be-part-of-this-new-clinical-waste-venture-with-waste-energy-power-partners/ P3P News Item June 15th 2020 accessed May 2021]</ref>. [[Andusia]] are acting as the sole supplier to the plant<ref>[https://www.andusia.co.uk/blog/2021/01/11/two-new-clinical-waste-plants-to-aid-disposal-of-covid-waste/#more-2234 Andusia News Item]</ref>. | One of the largest [[High Temperature and Clinical Waste Incineration|Clinical Waste Incinerators]] to built in the UK in the last 20 years, [[Scotia Business Park]] will trade under the brand [[Clinitek]] and is referred to as their '''Stoke-on-Trent''' facility<ref name="P3P1">[https://p3ppartners.com/p3p-partners-are-very-excited-to-be-part-of-this-new-clinical-waste-venture-with-waste-energy-power-partners/ P3P News Item June 15th 2020 accessed May 2021]</ref>. [[Andusia]] are acting as the sole supplier to the plant<ref>[https://www.andusia.co.uk/blog/2021/01/11/two-new-clinical-waste-plants-to-aid-disposal-of-covid-waste/#more-2234 Andusia News Item]</ref>. | ||
[[File:Stoke EfW 600-304x203.jpg|350px|left|Stoke Clinical Waste Incinerator - all rights reserved Andusia and P3P]]__TOC__ | {{ClinIncin|EPR={{#var:epr}}|id=4}}[[File:Stoke EfW 600-304x203.jpg|350px|left|Stoke Clinical Waste Incinerator - all rights reserved Andusia and P3P]]__TOC__ | ||
<br clear='left'/> | <br clear='left'/> | ||
Revision as of 18:49, 18 May 2021
One of the largest Clinical Waste Incinerators to built in the UK in the last 20 years, Scotia Business Park will trade under the brand Clinitek and is referred to as their Stoke-on-Trent facility[1]. Andusia are acting as the sole supplier to the plant[2].
Error: no local variable "site" has been set. | |
See HT & Clin → page for a larger UK Wide map. | |
Waste Licence | Error: no local variable "epr" has been set. |
Operator | [[Error: no local variable "operator" has been set.]] |
Operational Capacity | Error: no local variable "plated" has been set.tpa |
Number of Lines | Error: no local variable "line" has been set. |
Region | [[:Category:Error: no local variable "region" has been set.|Error: no local variable "region" has been set.]] |
Annual Report Data
Year | Total In | Total Clinical | IBA Out | ACP Out | Op Hours |
---|
Summary
One of the largest Clinical Waste Incinerators to built in the UK in the last 20 years, Scotia Business Park will trade under the name Clinitek and is referred to as their Stoke-on-Trent facility[1]. Andusia are acting as the sole supplier to the plant of up to 16,000 tonnes per annum[3].
Background
P3P Partners have developed the facility under their subsidiary Waste Energy Power Partners (WEPP) with finance by Equitix. Planning Permission was granted in March 2020 on the site of an old Biomass EfW site[1]. Waste Energy Power Partners are applying for permit - the consultation process is running to 4th June 2021. This is the second plant developed under the same arrangements, the first being Haylers End Energy Recovery Plant and often referred to as their Malvern plant, which has half the design throughput capacity of this facility.
Plant
Construction has commenced and is targeted for completion in Q3 2021 at a reported cost of £25 million[1]. The technology provider is Icinco via their FS2000 treatment unit[1] (2,000kg/hr capacity[4]) with construction oversight by Cobalt Energy[1]. At 8,000 hrs annual operation the maximum annual throughput would be 16,000 tonnes per annum, although the plated capacity has been reported as 12,800 tonnes in the past.