==Plant== | ==Plant== | ||
Construction has commenced and is targeted for completion in Q3 2021 at a reported cost of £25 million<ref name="P3P1" />. The technology provider is [[ | Construction has commenced and is targeted for completion in Q3 2021 at a reported cost of £25 million<ref name="P3P1" />. The technology provider is [[Incinco]] via their FS2000 treatment unit<ref name="P3P1" /> (2,000kg/hr capacity<ref>[https://irp-cdn.multiscreensite.com/3edaf5b1/files/uploaded/Freestanding%20Incinerator%20500-2000%20Leaflet.pdf Incinco PDF Factsheet]</ref>) with construction oversight by [[Cobalt Energy]]<ref name="P3P1" />. At 8,000 hrs annual operation the maximum annual throughput would be 16,000 tonnes per annum, although the plated capacity has been reported as 12,800 tonnes in the past. | ||