Template:EAIn: Difference between revisions

From Wikiwaste
No edit summary
No edit summary
Line 2: Line 2:
{{#clear_external_data:}}{{#get_db_data: db=engy|from=ea_ew_in|where=epr='{{{EPR}}}'|data=ewc=ewc,originregion=originregion,tin=tin}}
{{#clear_external_data:}}{{#get_db_data: db=engy|from=ea_ew_in|where=epr='{{{EPR}}}'|data=ewc=ewc,originregion=originregion,tin=tin}}
==EA Waste Tonnage==
==EA Waste Tonnage==
 
The table shows a list of the [[Waste]] that has arrived into sites as reported to the [[EA]] and then publicised in their [[EA Waste Interrogater]] tool for 2019. The total [[EA]] tonnage arriving at the site was: '''{{#if: {{var:total}} | {{formatnum: {{#expr: {{#var:total}} round 2}} }}t | 0t }}'''. Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:
TOTAL : {{#if: {{#var:total}} | {{#var:total}} | 0}}
 
>><<
 
The table shows a list of the [[Waste]] that has arrived into sites as reported to the [[EA]] and then publicised in their [[EA Waste Interrogater]] tool for 2019. The total [[EA]] tonnage arriving at the site was: '''{{formatnum: {{#expr: {{#var:total}} round 2}} }}t'''. Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:
* Tonnage may have been received but not [[incineration|incinerated]], i.e. the material is held pending [[incineration]] (the operator return to the [[EA]] reports as received whereas the annual report focuses on when the waste is incinerated)
* Tonnage may have been received but not [[incineration|incinerated]], i.e. the material is held pending [[incineration]] (the operator return to the [[EA]] reports as received whereas the annual report focuses on when the waste is incinerated)
* Material may have been received into the site but [[treatment|treated]] in some other way than [[incineration]]
* Material may have been received into the site but [[treatment|treated]] in some other way than [[incineration]]

Revision as of 08:21, 16 June 2021


EA Waste Tonnage

The table shows a list of the Waste that has arrived into sites as reported to the EA and then publicised in their EA Waste Interrogater tool for 2019. The total EA tonnage arriving at the site was: Expression error: Unexpected round operator.t. Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated)
  • Material may have been received into the site but treated in some other way than incineration
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site
EWC Code Origin of Waste Tonnes In