Template:EfWLAData: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
Line 1: Line 1:
==Local Authority Data==
==Local Authority Data==
{{#clear_external_data:}}{{#get_db_data: db=engy |from=wdfincin |where=epr='{{{EPR}}}' |data=tot=sum(ton)}}{{#vardefine: total| {{#external_value:tot}}}}
{{#clear_external_data:}}{{#get_db_data: db=engy |from=wdfincin |where=epr='{{{EPR}}}' |data=tot=sum(ton)}}{{#vardefine: total| {{#external_value:tot}}}}
The following  represents those [[Local Authority|local authorities]] recorded as putting tonnage (either directly or via a [[Transfer Station|transfer station]]) into the site on [[WasteDataFlow]] for the financial year 2019/20 and for Scotland for the calendar year 2019. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total [[Local Authority]] waste received by the plant in the period was: '''{{#if: {{#var:total}} | {{formatnum: {{#expr: {{#var:total}} round 2}} }}t | 0t }}'''
The following  represents those [[Local Authority|local authorities]] recorded as putting tonnage (either directly or via a [[Waste Transfer Station|transfer station]]) into the site on [[WasteDataFlow]] for the financial year 2019/20 and for Scotland for the calendar year 2019. The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). The total [[Local Authority]] waste received by the plant in the period was: '''{{#if: {{#var:total}} | {{formatnum: {{#expr: {{#var:total}} round 2}} }}t | 0t }}'''


A 'zero return' below indicates no [[Local Authority|local authority]] tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a [[Local Authority|local authority]]) or a result of the plant being recently commissioned and actually having received no tonnage. Additionally, lower than expected tonnage maybe a result of a [[Local Authority|local authority]] splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated, or it may be a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
A 'zero return' below indicates no [[Local Authority|local authority]] tonnage was recorded/no tonnage was sent to the site in the period (but has been listed as it may have previously received tonnage from a [[Local Authority|local authority]]) or a result of the plant being recently commissioned and actually having received no tonnage. Additionally, lower than expected tonnage maybe a result of a [[Local Authority|local authority]] splitting their tonnage over multiple sites, having less tonnage to send than might be anticipated, or it may be a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.