Lancing EfW: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
m minor text change
Line 23: Line 23:
| Total||63,754
| Total||63,754
|}
|}
The [[Wood Waste]] is received from a variety of sources, including [[Waste Disposal Authority]]s, al lof which is processed in the adjacent transfer station prior to use in the Enviropower site. The [[Wood Waste]] tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and are reported as '''60,356''' in the pull-out table to the right.
The [[Wood Waste]] is received from a variety of sources, including [[Waste Disposal Authority]]s, all of which is processed in the adjacent [[WTS|transfer station]] prior to use in the Enviropower site. The [[Wood Waste]] tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and are reported as '''60,356''' in the pull-out table to the right.


{{EfWLAData|EPR={{#var: epr}}}}
{{EfWLAData|EPR={{#var: epr}}}}