Beddington EfW: Difference between revisions

Arctellion (talk | contribs)
No edit summary
Bin52 (talk | contribs)
m add new link
Line 9: Line 9:
The Beddington facility was built primarily to service a 25 year [[PPP]] contract signed in November 2014 with the [[South London Waste Partnership]] comprising [[Croydon London Borough Council | Croydon]], [[Royal Borough of Kingston upon Thames| Kingston]], [[Merton London Borough Council | Merton]], [[Richmond upon Thames London Borough Council | Richmond]] and [[Sutton London Borough Council | Sutton]] receiving additional residual [[Commercial Waste]]. It is located in Sutton on [[Viridor]]'s [[Landfill]] site which is due to close with the operation of the facility, which commenced in January 2020.  
The Beddington facility was built primarily to service a 25 year [[PPP]] contract signed in November 2014 with the [[South London Waste Partnership]] comprising [[Croydon London Borough Council | Croydon]], [[Royal Borough of Kingston upon Thames| Kingston]], [[Merton London Borough Council | Merton]], [[Richmond upon Thames London Borough Council | Richmond]] and [[Sutton London Borough Council | Sutton]] receiving additional residual [[Commercial Waste]]. It is located in Sutton on [[Viridor]]'s [[Landfill]] site which is due to close with the operation of the facility, which commenced in January 2020.  


On the 9th December 2020 the [[Environment Agency]] dertermined a varitation of the permit and issued a 15% increase in the tonnage throughput from a maximum of 302,500 tonnes of waste per year to a maximum of 347,422 tonnes of waste per year.<ref>[https://www.letsrecycle.com/news/latest-news/waste-arisings-up-5-8-in-south-london-partnership-area/ Letsrecycle Article]</ref>.
On the 9th December 2020 the [[Environment Agency]] dertermined a varitation of the permit and issued a 15% increase in the tonnage throughput from a maximum of 302,500 tonnes of waste per year to a maximum of 347,422 tonnes of waste per year.<ref>[https://www.letsrecycle.com/news/latest-news/waste-arisings-up-5-8-in-south-london-partnership-area/ Letsrecycle Article]</ref>. It was reported in January 2022 that a further application to increase the [[Environmental Permit|environmental permit]] to 382,000 tonnes per annum was been made by [[Viridor]] to the [[Environment Agency]]<ref>[https://www.letsrecycle.com/news/slwp-and-viridor-clash-over-beddington-expansion/ Letsrecycle.com Article]</ref>.


==Plant==
==Plant==