Line 18: Line 18:
#Ash is released from the primary combustion chamber on a batch wise basis.
#Ash is released from the primary combustion chamber on a batch wise basis.
#The gas from the secondary chamber passes into the boiler where it is cooled down by producing steam. The steam is either sent to the EfW plant or the air blast coolers where it is condensed.
#The gas from the secondary chamber passes into the boiler where it is cooled down by producing steam. The steam is either sent to the EfW plant or the air blast coolers where it is condensed.
#Gas from the boiler passes into the [[Flue Gas Treatment plant]]. Here the gas is cooled and passed through the reactor, filter units.
#Gas from the boiler passes into the [[Flue Gas|Flue Gas Treatment plant]]. Here the gas is cooled and passed through the reactor, filter units.
#On leaving the treatment plant the [[flue gas]] is passed through the Induced Draft Fan and then sent to atmosphere via the stack.
#On leaving the treatment plant the [[Flue Gas|flue gas]] is passed through the Induced Draft Fan and then sent to atmosphere via the stack.
#The plant incorporates CEMS (Continuous Emission Monitoring System).
#The plant incorporates CEMS (Continuous Emission Monitoring System).
#The plant uses gas, electricity, water, compressed air and hydraulic services.
#The plant uses gas, electricity, water, compressed air and hydraulic services.