Scotia Business Park: Difference between revisions

Bin52 (talk | contribs)
updated permit and status
No edit summary
Line 11: Line 11:


==Plant==
==Plant==
Construction has commenced and was targeted for completion in Q3 2021 at a reported cost of £25 million<ref name="P3P1" />. The technology provider is [[Incinco]] via their FS2000 treatment unit<ref name="P3P1" /> (2,000kg/hr capacity<ref>[https://irp-cdn.multiscreensite.com/3edaf5b1/files/uploaded/Freestanding%20Incinerator%20500-2000%20Leaflet.pdf Incinco PDF Factsheet]</ref>) with construction oversight by [[Cobalt Energy]]<ref name="P3P1" />. At 8,000 hrs annual operation the maximum annual throughput would be 16,000 tonnes per annum, although the plated capacity has been reported as 12,800 tonnes in the past. The construction was reported as completed in March 2022 with full operation planned by the summer of 2022<ref>https://www.letsrecycle.com/news/construction-complete-at-stoke-clinical-waste-plant/<ref>.
Construction has commenced and was targeted for completion in Q3 2021 at a reported cost of £25 million<ref name="P3P1" />. The technology provider is [[Incinco]] via their FS2000 treatment unit<ref name="P3P1" /> (2,000kg/hr capacity<ref>[https://irp-cdn.multiscreensite.com/3edaf5b1/files/uploaded/Freestanding%20Incinerator%20500-2000%20Leaflet.pdf Incinco PDF Factsheet]</ref>) with construction oversight by [[Cobalt Energy]]<ref name="P3P1" />. At 8,000 hrs annual operation the maximum annual throughput would be 16,000 tonnes per annum, although the plated capacity has been reported as 12,800 tonnes in the past. The construction was reported as completed in March 2022 with full operation planned by the summer of 2022<ref>https://www.letsrecycle.com/news/construction-complete-at-stoke-clinical-waste-plant/</ref>.


==References==
==References==