Brickfields Way Transfer Station
James Waste Management Llp
Site Location
Site Location

See Qualifying MRF → page for a larger UK Wide map.

Tonnage Summary
Data 2020
EA Tonnage IN 74,784.6
EA Tonnage OUT 74,314.26
Qualifying IN 6,823.96
Qualifying OUT 5,105.78

Summary

Text to be added

History

Text to be added

Plant

Text to be added



Permit Tonnage Received (IN)

Total Tonnage by EWC Code

The table shows a list of the Waste for the Permit 71431, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was updated on Jan 21 - Dec 21. The total reported tonnage arriving at the site was: 74,784.6t.

EWC Code Description Tonnes In
15 01 06 mixed packaging 4,115.30
17 09 04 mixed construction and demolition wastes other than those mentioned in 17 09 01, 17 09 02 and 17 09 03 8,851.30
19 12 12 other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11 78.18
20 03 01 mixed municipal waste 56,443.96
20 03 03 street-cleaning residues 2,263.62
20 03 07 bulky waste 3,032.24

Total Tonnage by Origin of EWC Code

The table below shows the same data as the table above, but split according to the origin of each EWC code waste stream entering into the site as reported to the Regulator.

EWC Code Origin of Waste Tonnes In
15 01 06 East of England 3,146.24
15 01 06 London 330.36
15 01 06 South East 21.38
15 01 06 Wales 319.62
15 01 06 West Midlands 297.70
17 09 04 East of England 8,851.30
19 12 12 London 78.18
20 03 01 East of England 49,963.76
20 03 01 London 6,081.42
20 03 01 Wales 398.78
20 03 03 East of England 2,263.62
20 03 07 East of England 366.92
20 03 07 South East 2,665.32




Permit Tonnage Sent Out (OUT)

The table shows a list of the Waste for the Permit 71431, that has left the site as reported to the Regulator and then publicised in their reported statistics. The Data was updated on Jan 21 - Dec 21. The total reported tonnage arriving at the site was: 74,314.26t.

EWC Code Description Tonnes In
17 01 07 mixtures of concrete, bricks, tiles and ceramics other than those mentioned in 17 01 06 1,464.96
17 02 01 wood 3,177.92
17 09 04 mixed construction and demolition wastes other than those mentioned in 17 09 01, 17 09 02 and 17 09 03 563.36
19 12 12 other wastes (including mixtures of materials) from mechanical treatment of wastes other than those mentioned in 19 12 11 3,008.46
20 01 01 paper and cardboard 5,872.56
20 01 39 plastics 936.34
20 01 40 metals 132.84
20 02 01 biodegradable waste 26.78
20 03 01 mixed municipal waste 59,131.04



Qualifying MRF Tonnage Received

During 2020 the site received 6,824t as qualifying material, as broken down below.


Quarter Supplier Tonnage Number of Samples Total Samples Weight (kg) Glass (%) Metal (%) Paper (%) Plastic (%) Overall (%) Non Target Material (%) Non Recycleable Material (%)
Jan-Mar Veolia 541.20 5 410.00 14.00 0.80 39.70 4.50 59.00 2.00 39.00
Jan-Mar First Mile 526.76 5 408.00 14.50 1.10 37.60 4.80 58.00 2.10 39.90
Jan-Mar Bywaters 1817.00 15 1213.00 14.00 1.00 46.00 2.80 63.80 2.00 34.20
Jan-Mar Biffa 281.48 3 245.00 15.70 1.30 36.80 4.40 58.20 2.20 39.60
Jan-Mar Amey 239.08 2 165.00 0.00 0.00 99.50 0.00 99.50 0.50 0.00
Jan-Mar Renewi 1430.20 12 979.00 15.20 1.70 39.90 4.70 61.50 1.70 36.80
Apr-Jun First Mile 21.28 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Apr-Jun Renewi 1414.14 13 1065.00 12.00 1.40 43.10 5.00 65.00 5.20 29.80
Apr-Jun Newport Paper 15.72 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Apr-Jun Biffa 10.78 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Apr-Jun Veolia 6.86 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Jul-Sep Veolia 9.86 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Jul-Sep Newport Paper 29.18 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Jul-Sep Renewi 94.82 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Oct-Dec Biffa 325.46 3 244.00 13.00 1.50 42.10 5.20 61.80 1.50 36.70
Oct-Dec Veolia 60.14 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


Qualifying MRF Tonnage Sent Out

During 2020 the site removed5,106t of qualifying material, as broken down below.


Quarter Material Tonnage Number of Samples Total Samples Weight Target Material (%) Non Target Material (%) Non Recycleable Material (%)
Apr-Jun Metal 35.84 2 21.00 99.00 1.00 0.00
Apr-Jun Paper 133.00 3 152.00 99.50 0.50 0.00
Apr-Jun Paper 45.56 1 50.00 99.00 1.00 0.00
Apr-Jun Glass 124.92 3 32.00 97.00 3.00 0.00
Apr-Jun Plastic 186.32 13 263.00 99.00 1.00 0.00
Jan-Mar Glass 1301.64 27 273.00 97.00 3.00 0.00
Jan-Mar Paper 1228.70 21 1067.00 99.00 1.00 0.00
Jan-Mar Plastic 97.72 7 142.00 97.00 3.00 0.00
Jan-Mar Plastic 284.76 19 395.00 99.00 1.00 0.00
Jan-Mar Metal 66.50 4 43.00 99.00 1.00 0.00
Jan-Mar Paper 774.40 13 664.00 99.50 0.50 0.00
Jul-Sep Plastic 18.94 2 41.00 97.00 3.00 0.00
Jul-Sep Plastic 92.24 7 146.00 98.00 2.00 0.00
Jul-Sep Metal 272.46 14 151.00 99.00 0.50 0.50
Jul-Sep Paper 111.50 2 107.00 99.50 0.50 0.00
Jul-Sep Paper 44.08 1 53.00 99.00 1.00 0.00
Jul-Sep Glass 102.74 3 32.00 97.00 3.00 0.00
Oct-Dec Plastic 16.46 1 21.00 98.00 2.00 0.00
Oct-Dec Metal 20.46 1 12.00 99.00 0.50 0.50
Oct-Dec Paper 147.54 3 155.00 99.00 1.00 0.00

References