Advanced Biofuel Solutions: Difference between revisions
add page specific text |
mNo edit summary |
||
Line 13: | Line 13: | ||
The construction, including early stage commissioning is complete and full operation is planned in 2022. | The construction, including early stage commissioning is complete and full operation is planned in 2022. | ||
The next stage of development is a full scale project which has progressed to a | The next stage of development is a full scale project which has progressed to a [[Front-End Engineering Design]] ([[FEED]]) phase by [[Petrofac]] for delivery of the [[gasification|gasifier]] by [[Sumitomo SHI FW]] by 2025, processing 150,000 tonnes per annum of feedstock<ref name="ref1"/>. | ||
==Waste Input== | ==Waste Input== |
Latest revision as of 07:02, 26 July 2022
An EfW facility based on a new gasification technology at demonstration scale, based in Swindon, due for construction completion in 2022.[1]
Billingham Reach Planning | |
See Residual EfW → page for a larger UK Wide map. | |
Waste Licence | Tbc55 |
Operator | Tees Eco Energy Ltd |
Region | North East |
Operational Capacity | 375ktpa |
Is site R1? | fal |
When was R1 Granted? | |
What was the R1 value | 0.00 |
Electrical Capacity | 35.70MWe |
Number of Lines | 0 |
Number of Turbines | 0 |
CHP | |
Technology Approach | EfW |
Funding Type | [[]] |
Operators Annual Report
Input Data
Year | HH | C&I | Clin | RDF | Total |
---|
Output Data
Year | IBA | IBA %ge of Tot IN | APC | APC %ge of Tot IN |
---|
Summary
An EfW facility based on a new gasification technology at demonstration scale, based in Swindon, due for construction completion in 2022. Advanced Biofuel Solutions Ltd and Greenergy signed a joint development agreement in November 2021 to develop up to 5 plants in in the UK, the first of which is planned in the north west and understood to be the Protos (Bio-Sustainable Natural Gas) Plot 4[1].
Technology
A proprietary gasification technology, developed by Advanced Biofuel Solutions Ltd called 'RadGas'. The Swindon plant is designed to convert household waste into a 'bio-substitute natural gas (BioSNG) - comprising the refinement of the syngas produced into hydrogen, liquid fuels and propane[1].
Construction
The construction, including early stage commissioning is complete and full operation is planned in 2022.
The next stage of development is a full scale project which has progressed to a Front-End Engineering Design (FEED) phase by Petrofac for delivery of the gasifier by Sumitomo SHI FW by 2025, processing 150,000 tonnes per annum of feedstock[1].
Waste Input
The demonstration plant in Swindon handles 8,000 tonnes per annum of RDF produced from Household Waste, but has also processed Wood Waste, Tyres made into a crumb, Waste Oil and Automotive Shredder Residue[1].