Templeborough Biomass Power Plant: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
add page specific text
 
Bin52 (talk | contribs)
(No difference)

Revision as of 12:17, 9 August 2022


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total
2018 67486 0 0 0 67486
2019 207916 0 0 0 207916
2020 240778 0 0 0 240778
2021 297951 0 0 0 297951
2022 251678 0 0 0 251678


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2018 4241 6.28% 1100 1.63%
2019 58449 28.11% 15005 7.22%
2020 11657 4.84% 4050 1.68%
2021 21747 7.30% 6143 2.06%
2022 19928 7.92% 6486 2.58%


Summary

Plant

Tonnage Input/Fuel

References