A [[Biomass EfW]] facility, [[Welland Bio Power]] is based on processing up to 72,000 tonnes per annum of [[Wood Waste]] producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020]].</ref>.
[[Category:Biomass EfW Plants]]{{#vardefine: epr|AP3432QC}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|AP3432QC}}
{{BiomassPlant|NAME=Welland Bio Power Ltd|id=89|EPR={{#var: epr}}}}
{{BiomassPlant|NAME=Welland Bio Power|id=89|EPR={{#var: epr}}}}
[[File:Welland Bio Power.png|400px|left|Welland Bio Power. CoGen, 2018.]]__TOC__
[[File:Welland Bio Power.png|400px|left|Welland Bio Power. CoGen, 2018.]]<ref>[https://www.cogenuk.com/projects/ Welland Bio Power Site Photo]All Rights Reserved</ref>__TOC__
<br clear='left'/>
<br clear='left'/>
<ref>[https://www.cogenuk.com/projects/ Welland Bio Power Site Photo]All Rights Reserved</ref>


==Summary==
==Summary==
A [[Biomass EfW]] facility, Welland Bio Power is based on processing up to 72,000 tonnes per annum of [[Wood Waste]] producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020]].</ref>.
A [[Biomass EfW]] facility, [[Welland Bio Power]] is based on processing up to 72,000 tonnes per annum of [[Wood Waste]] producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met<ref name="ref1"/>.


The facility is located near Theddingworth in Northamptonshire. The [[Wood Waste]] feedstock is sourced locally through a contract with [[Welland Waste Management]]’s adjacent waste timber processing facility<ref name="ref1"/>.
The facility is located near Theddingworth in Northamptonshire. The [[Wood Waste]] feedstock is sourced locally through a contract with [[Welland Waste Management]]’s adjacent waste timber processing facility<ref name="ref1"/>.
Line 18: Line 18:


The facility replicates its sister project [[Birmingham Bio Power]].
The facility replicates its sister project [[Birmingham Bio Power]].
 
{{BioSustain|EPR={{#var: epr}}}}
==Tonnage Input/Fuel==
{{EAIn|EPR={{#var: epr}}}}
The tonnage received by the plant is reported as [[Wood Waste]] in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref>. Because the plant is an [[Advanced Conversion Technology]] and produces a [[Syngas]] the sustainability report talks in terms of the gas input to the energy recovery system, rather than the unprocessed [[Wood Waste]] into the plant, which was 305,783,697 cubic meters.
The [[Wood Waste]] is exclusively supplied by [[Welland Waste Management]] which sources much of the [[Wood Waste]] from [[Waste Disposal Authorities]].  
The [[Wood Waste]] is exclusively supplied by [[Welland Waste Management]] which sources much of the [[Wood Waste]] from [[Waste Disposal Authorities]]. The [[Wood Waste]] tonnage received and recorded in the [[EA]] statistics for the calendar year (i.e. January 2018 to December 2018) was '''9,190''' tonnes.  


==References==
==References==
<references/>
<references/>

Revision as of 10:53, 15 August 2022

A Biomass EfW facility, Welland Bio Power is based on processing up to 72,000 tonnes per annum of Wood Waste producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met[1].


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total
2018 54715 0 0 -950 53765
2019 60673 0 0 -773 59900
2020 44379 0 0 -1005 43374
2021 42472 0 0 0 41429
2022 56951 0 0 0 56301


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2018 1783 3.32% 604 1.12%
2019 2319 3.87% 955 1.59%
2020 2245 5.18% 673 1.55%
2021 2013 4.86% 596 1.44%
2022 2090 3.71% 743 1.32%

Welland Bio Power. CoGen, 2018.
Welland Bio Power. CoGen, 2018.

[2]


Summary

A Biomass EfW facility, Welland Bio Power is based on processing up to 72,000 tonnes per annum of Wood Waste producing 10.6 MWe gross power to be exported to the national grid after the facility’s own energy requirements are met[1].

The facility is located near Theddingworth in Northamptonshire. The Wood Waste feedstock is sourced locally through a contract with Welland Waste Management’s adjacent waste timber processing facility[1].

Welland Bio Power is operated by Nexterra and was developed by CoGen in partnership with Welland Waste Management. CoGen continues to provide management services[1].

Plant

The facility utilises Nexterra’s fixed-bed updraft gasification system technology, which is an Advanced Conversion Technology. MWH Treatment provided EPC services for the project[3].

The facility cost £51.6 million to develop and was financed by Balfour Beatty Investments, NOY Nexterra Holdings Limited Partnership (a partnership between NOY Infrastructure Fund and Nexterra) and Equitix MA Infrastructure Fund[3].

The facility replicates its sister project Birmingham Bio Power.

Annual Sustainability Tonnage Input/Fuel

The tonnage[4] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for 2020/21 was reported by Ofgem as below[5]:

Year Waste Wood (m3) Waste Wood (t) Straw Miscanthus Arboricultrual Waste Sawmill Residue Foresrty Residue Round Wood Short Rotation Coppice MBM Other Material
2020/21 243180786 0 0 0 0 0 0 0 0 0 0
2019/20 392863293 0 0 0 0 0 0 0 0 0 0
2018/19 305783697 0 0 0 0 0 0 0 0 0 0
2017/18 0 0 0 0 0 0 0 0 0 0 0

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit AP3432QC, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In


The Wood Waste is exclusively supplied by Welland Waste Management which sources much of the Wood Waste from Waste Disposal Authorities.

References