Sleaford REP: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
add page specific text
 
Bin52 (talk | contribs)
No edit summary
Line 5: Line 5:


==Summary==
==Summary==
 
to add


==Plant==
==Plant==
to add


 
{{BioSustain|EPR={{#var: epr}}}}
==Tonnage Input/Fuel==
{{EAIn|EPR={{#var: epr}}}}
 


==References==
==References==
<references />
<references />

Revision as of 08:48, 15 August 2022


Sleaford REP
Operational
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Burmeister & Wain Scandinavian Contractor (BWSC)
Capacity 38 MWe
Feedstock Straw/Virgin
EPR (Waste Licence) DP3030XH
ROC Yes
CfD
CHP Unkwn

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Picture of Sleaford Power Plant, all rights reserved bwsc.com
Picture of Sleaford Power Plant, all rights reserved bwsc.com


Summary

to add

Plant

to add

Annual Sustainability Tonnage Input/Fuel

The tonnage[1] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for 2020/21 was reported by Ofgem as below[2]:

Year Waste Wood (m3) Waste Wood (t) Straw Miscanthus Arboricultrual Waste Sawmill Residue Foresrty Residue Round Wood Short Rotation Coppice MBM Other Material
2020/21 0 32 155475 0 0 0 0 9971 712 0 0
2019/20 0 1684 225703 0 0 0 0 1949 0 0 0
2018/19 0 14032 146220 0 0 0 0 0 0 0 0
2017/18 0 0 0 0 0 0 0 0 0 0 0

The query SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='DP3030XH' LIMIT 1 is invalid (Error : SSL SYSCALL error: EOF detected

Function: EDConnectorRdbms::fetch Query: SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='DP3030XH' LIMIT 1 ).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit DP3030XH, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In


References

  1. In the case of EfW plants with gasification technology the figures are reported in terms of cubic metres of syngas produced rather than tonnes used
  2. Biomass Sustainability Dataset 2020-21