Thetford Power Station: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
add pic and tonnage
Bin52 (talk | contribs)
No edit summary
Line 5: Line 5:


==Summary==
==Summary==
 
to add


==Plant==
==Plant==
to add


{{BioSustain|EPR={{#var: epr}}}}
{{BioSustain|EPR={{#var: epr}}}}

Revision as of 17:37, 11 August 2022


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total
2018 38274 422583 0 0 460857
2019 43461 449655 0 0 493116
2020 59713 431356 0 5922 496992
2021 51881 390383 0 55589 497853
2022 62297 337561 0 61623 461481


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2018 8782 1.91% 1337 0.29%
2019 7994 1.62% 686 0.14%
2020 7995 1.61% 686 0.14%
2021 10951 2.20% 13339 2.68%

Thetford Power Station - geograph.org.uk - 422118
Thetford Power Station - geograph.org.uk - 422118


Summary

to add

Plant

to add

Annual Sustainability Tonnage Input/Fuel

The tonnage[1] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for 2020/21 was reported by Ofgem as below[2]:

Year Waste Wood (m3) Waste Wood (t) Straw Miscanthus Arboricultrual Waste Sawmill Residue Foresrty Residue Round Wood Short Rotation Coppice MBM Other Material
2020/21 0 0 0 0 35940 0 21568 0 0 5921 428699
2019/20 0 0 0 0 31857 0 18211 0 0 0 459437
2018/19 0 0 0 0 25965 0 11076 0 0 0 413527
2017/18 0 0 0 0 0 0 0 0 0 0 0

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit PP3235LP, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data was last updated on October 2024. The total reported tonnage arriving at the site was: 136,545.14t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In
02 01 99 Norfolk 14775.96
02 01 06 Norfolk 103698.74