Plymouth Timber Resource Recovery Plant: Difference between revisions
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
A [[Biomass EfW]] facility [[Plymouth Timber Resource Recovery Plant]] (also known as Dartmoor Bio Power) is based on up to 36,000 tonnes per annum of [[Wood Waste]] producing 4.3 MWe gross power. | |||
[[Category:Biomass EfW Plants]]{{#vardefine: epr|XP3134AW}} | [[Category:Biomass EfW Plants]]{{#vardefine: epr|XP3134AW}} | ||
{{BiomassPlant|NAME=Plymouth Timber Resource Recovery Plant|id=26|EPR={{#var: epr}}}} | {{BiomassPlant|NAME=Plymouth Timber Resource Recovery Plant|id=26|EPR={{#var: epr}}}} | ||
Line 6: | Line 7: | ||
==Summary== | ==Summary== | ||
A [[Biomass EfW]] facility based on up to 36,000 tonnes per annum of [[Wood Waste]] producing 4.3 MWe gross power. The facility is located in Plymouth, Devon, and the [[Wood Waste]] feedstock is locally sourced by a local waste timber aggregator. This facility benefits from a private wire arrangement and heat off-take to a large local business<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020].</ref>. | A [[Biomass EfW]] facility [[Plymouth Timber Resource Recovery Plant]] (also known as Dartmoor Bio Power) is based on up to 36,000 tonnes per annum of [[Wood Waste]] producing 4.3 MWe gross power. The facility is located in Plymouth, Devon, and the [[Wood Waste]] feedstock is locally sourced by a local waste timber aggregator. This facility benefits from a private wire arrangement and heat off-take to a large local business<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020].</ref>. | ||
The facility was developed by [[CoGen]] who continues to provide management services<ref name="ref1"/>. | The facility was developed by [[CoGen]] who continues to provide management services<ref name="ref1"/>. |