Plymouth Timber Resource Recovery Plant: Difference between revisions

Bin52 (talk | contribs)
No edit summary
Bin52 (talk | contribs)
No edit summary
 
Line 1: Line 1:
A [[Biomass EfW]] facility [[Plymouth Timber Resource Recovery Plant]] (also known as Dartmoor Bio Power) is based on up to 36,000 tonnes per annum of [[Wood Waste]] producing 4.3 MWe gross power.
[[Category:Biomass EfW Plants]]{{#vardefine: epr|XP3134AW}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|XP3134AW}}
{{BiomassPlant|NAME=Plymouth Timber Resource Recovery Plant|id=26|EPR={{#var: epr}}}}
{{BiomassPlant|NAME=Plymouth Timber Resource Recovery Plant|id=26|EPR={{#var: epr}}}}
Line 6: Line 7:


==Summary==
==Summary==
A [[Biomass EfW]] facility based on up to 36,000 tonnes per annum of [[Wood Waste]] producing 4.3 MWe gross power. The facility is located in Plymouth, Devon, and the [[Wood Waste]] feedstock is locally sourced by a local waste timber aggregator. This facility benefits from a private wire arrangement and heat off-take to a large local business<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020].</ref>.
A [[Biomass EfW]] facility [[Plymouth Timber Resource Recovery Plant]] (also known as Dartmoor Bio Power) is based on up to 36,000 tonnes per annum of [[Wood Waste]] producing 4.3 MWe gross power. The facility is located in Plymouth, Devon, and the [[Wood Waste]] feedstock is locally sourced by a local waste timber aggregator. This facility benefits from a private wire arrangement and heat off-take to a large local business<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020].</ref>.


The facility was developed by [[CoGen]] who continues to provide management services<ref name="ref1"/>.  
The facility was developed by [[CoGen]] who continues to provide management services<ref name="ref1"/>.