Boston Energy Production Facility: Difference between revisions
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
Also known as Biomass UK No 3, [[Boston Energy Production Facility]] is a [[Biomass EfW]] facility based on [[Wood Waste]] or [[RDF]] designed to export 11.7MWe of power<ref>Annual Report 2021</ref>. | |||
[[Category:Biomass EfW Plants]]{{#vardefine: epr|UP3131DF}} | [[Category:Biomass EfW Plants]]{{#vardefine: epr|UP3131DF}} | ||
{{BiomassPlant|NAME=Boston Energy Production Facility|id=105|EPR={{#var: epr}}}} | {{BiomassPlant|NAME=Boston Energy Production Facility|id=105|EPR={{#var: epr}}}} | ||
| Line 5: | Line 6: | ||
==Summary== | ==Summary== | ||
to | Also known as Biomass UK No 3, [[Boston Energy Production Facility]] is a [[Biomass EfW]] facility based on [[Wood Waste]] or [[RDF]] designed to export 11.7MWe of power<ref>Annual Report 2021</ref>. The plant was developed by [[Aviva Investors]]<ref>https://www.letsrecycle.com/news/boston-biomass-approved-nrw-consults-barry/</ref>. | ||
==Plant== | ==Plant== | ||
to | The plant is based on a [[gasification]] technology via a [[fluidised bed]] with power generation via a steam [[boiler]] and [[turbine]] designed to process up to 86,400 tonnes per annum ata nominal capacity of 10.8 tonnes per hour<ref>Permit Decision Document</ref>. The plant remainder closed much of 2021 to allow for an upgrade programme and did not generate any power in the year<ref>Annual Report</ref>. | ||
{{BioSustain|EPR={{#var: epr}}}} | {{BioSustain|EPR={{#var: epr}}}} | ||
{{EAIn|EPR={{#var: epr}}}} | {{EAIn|EPR={{#var: epr}}}} | ||