Boston Energy Production Facility: Difference between revisions

From Wikiwaste
Bin52 (talk | contribs)
No edit summary
Bin52 (talk | contribs)
No edit summary
Line 1: Line 1:
Also known as Biomass UK No 3, [[Boston Energy Production Facility]] is a [[Biomass EfW]] facility based on [[Wood Waste]] or [[RDF]] designed to export 11.7MWe of power<ref>Annual Report 2021</ref>.
[[Category:Biomass EfW Plants]]{{#vardefine: epr|UP3131DF}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|UP3131DF}}
{{BiomassPlant|NAME=Boston Energy Production Facility|id=105|EPR={{#var: epr}}}}
{{BiomassPlant|NAME=Boston Energy Production Facility|id=105|EPR={{#var: epr}}}}
Line 5: Line 6:


==Summary==
==Summary==
to add
Also known as Biomass UK No 3, [[Boston Energy Production Facility]] is a [[Biomass EfW]] facility based on [[Wood Waste]] or [[RDF]] designed to export 11.7MWe of power<ref>Annual Report 2021</ref>. The plant was developed by [[Aviva Investors]]<ref>https://www.letsrecycle.com/news/boston-biomass-approved-nrw-consults-barry/</ref>.


==Plant==
==Plant==
to add
The plant is based on a [[gasification]] technology via a [[fluidised bed]] with power generation via a steam [[boiler]] and [[turbine]] designed to process up to 86,400 tonnes per annum ata nominal capacity of 10.8 tonnes per hour<ref>Permit Decision Document</ref>. The plant remainder closed much of 2021 to allow for an upgrade programme and did not generate any power in the year<ref>Annual Report</ref>.
 
{{BioSustain|EPR={{#var: epr}}}}
{{BioSustain|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}
{{EAIn|EPR={{#var: epr}}}}

Revision as of 15:43, 22 August 2022

Also known as Biomass UK No 3, Boston Energy Production Facility is a Biomass EfW facility based on Wood Waste or RDF designed to export 11.7MWe of power[1].


Boston Energy Production Facility
Under Construction
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Biomass UK No3
Capacity 11.7 MWe
Feedstock Waste Wood/RDF
EPR (Waste Licence) UP3131DF
ROC
CfD
CHP Unkwn

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total
2019 8772 0 0 0 8772
2020 6897 0 1147 0 8044
2021 60 0 0 0 60
2022 10145 0 11814 0 21959


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN
2019 66 0.75% 149 1.70%
2020 483 6.00% 224 2.78%
2022 1189 5.41% 1077 4.90%


Summary

Also known as Biomass UK No 3, Boston Energy Production Facility is a Biomass EfW facility based on Wood Waste or RDF designed to export 11.7MWe of power[2]. The plant was developed by Aviva Investors[3].

Plant

The plant is based on a gasification technology via a fluidised bed with power generation via a steam boiler and turbine designed to process up to 86,400 tonnes per annum ata nominal capacity of 10.8 tonnes per hour[4]. The plant remainder closed much of 2021 to allow for an upgrade programme and did not generate any power in the year[5].

Annual Sustainability Tonnage Input/Fuel

The tonnage[6] received by the plant in the most recent Annual Sustainability Report and for the previous 3 years for 2020/21 was reported by Ofgem as below[7]:

Year Waste Wood (m3) Waste Wood (t) Straw Miscanthus Arboricultrual Waste Sawmill Residue Foresrty Residue Round Wood Short Rotation Coppice MBM Other Material
2020/21 0 0 0 0 0 0 0 0 0 0 0
2019/20 0 0 0 0 0 0 0 0 0 0 0
2018/19 0 0 0 0 0 0 0 0 0 0 0

The query SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='UP3131DF' LIMIT 1 is invalid (Error : SSL SYSCALL error: EOF detected

Function: EDConnectorRdbms::fetch Query: SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='UP3131DF' LIMIT 1 ).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit UP3131DF, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In


References

  1. Annual Report 2021
  2. Annual Report 2021
  3. https://www.letsrecycle.com/news/boston-biomass-approved-nrw-consults-barry/
  4. Permit Decision Document
  5. Annual Report
  6. In the case of EfW plants with gasification technology the figures are reported in terms of cubic metres of syngas produced rather than tonnes used
  7. Biomass Sustainability Dataset 2020-21