Boston Energy Production Facility: Difference between revisions

Bin52 (talk | contribs)
No edit summary
Bin52 (talk | contribs)
No edit summary
Line 1: Line 1:
Also known as Biomass UK No 3, [[Boston Energy Production Facility]] is a [[Biomass EfW]] facility based on [[Wood Waste]] or [[RDF]] designed to export 11.7MWe of power<ref>Annual Report 2021</ref>.
[[Category:Biomass EfW Plants]]{{#vardefine: epr|UP3131DF}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|UP3131DF}}
{{BiomassPlant|NAME=Boston Energy Production Facility|id=105|EPR={{#var: epr}}}}
{{BiomassPlant|NAME=Boston Energy Production Facility|id=105|EPR={{#var: epr}}}}
Line 5: Line 6:


==Summary==
==Summary==
to add
Also known as Biomass UK No 3, [[Boston Energy Production Facility]] is a [[Biomass EfW]] facility based on [[Wood Waste]] or [[RDF]] designed to export 11.7MWe of power<ref>Annual Report 2021</ref>. The plant was developed by [[Aviva Investors]]<ref>https://www.letsrecycle.com/news/boston-biomass-approved-nrw-consults-barry/</ref>.


==Plant==
==Plant==
to add
The plant is based on a [[gasification]] technology via a [[fluidised bed]] with power generation via a steam [[boiler]] and [[turbine]] designed to process up to 86,400 tonnes per annum ata nominal capacity of 10.8 tonnes per hour<ref>Permit Decision Document</ref>. The plant remainder closed much of 2021 to allow for an upgrade programme and did not generate any power in the year<ref>Annual Report</ref>.
 